Laserfiche WebLink
4.0 SUMMARY AND CONCLUSIONS <br />No significant, unpredicted, or adverse environmental impacts were detected during hydrologic monitoring <br />for 2004. Thus, under the temporary cessation monitoring plan, none of the seven events that might trigger <br />reversion to the active mining plan occurred (see TR01-32, Appendix D, June 21, 2001). All monitoring <br />requirements were met. <br /> <br /> <br />6 <br />I:\Env\EmpireW H R\2004\Text\Empire2004AH R.doc <br />