Laserfiche WebLink
DAILY DIARY <br />PROJECT: ALMA PLACER MINE <br />LOCATION: PARK COUNTY, COLORADO <br />SOURCE: BERM CONSTRUCTION <br />PROJECT NO: 1-4561-11191-10 REPORT N0: 4 DATE: 6/8 90 <br />PROCTOR N0: N/A TIME: 10. HOURS <br />SAMPLE NO: 1 ENGINEERING TECHNICIAN: DEA GELIS <br />MORK PERFORMED: <br />Fill placement continued today on both sides of the berm today. a material was <br />moisture conditioned prior to being compacted with vibratory sheeps oot compactors. <br />No fill was placed on the outside of the berm in an area approxima ely 250 to 350 <br />feet south of Station 1+00. Very moist clay was present in t is area. The <br />material was scarified while fill operations continued to the north. <br />i <br />I <br />I <br />REMARKS: <br />Nine nuclear density tests and one sand cone density test was p rformed at the <br />given locations and elevations. All of the test results indicated hat the minimum <br />compaction requirements were met. <br /> <br />Mr. Fred Ladd with Ladd Engineering arrived at the site at approxim ately 3:00 p.m. <br />and was informed of the test results. <br />I <br />I <br />i <br />DAILY DIARY ~ <br />I <br />'~,,~' <br />'/'~'Y ' OEOTECNNICAL. MATERIALS i <br />11 <br />I.~ <br />1 <br />1 <br />i <br />IV A ENVIRONMENTAL CONSULTANTS <br /> <br /> <br /> <br />