My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP46774
DRMS
>
Back File Migration
>
Report
>
REP46774
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:50:07 AM
Creation date
11/27/2007 11:17:34 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1985029
IBM Index Class Name
Report
Doc Date
7/3/1990
From
FOX CONSULTANTS OF COLO INC
To
LADD ENGINEERING
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />1 <br />L <br />DAILY DIARY <br />PROJECT: ALMA PLACER MINE <br />LOCATION: PARK COUNTY, COLORADO I <br />SOURCE: BERM CONSTRUCTION <br />PROJECT N0: 1-4561-11191-10 REPORT N0: 3 DATE: 6//90 <br />PROCTOR N0: N/A TIME: 10.5 HOURS <br />SAMPLE N0: 1 ENGINEERING TECHNICIAN: DE NGELIS <br />YORK PERFORMED: <br />The placement of fill material continued on the outside of the erm today, from <br />Stations 4+00 through 1+00, and also south of 1+00. <br />The placement Gf fill material also took place on the inside of t e berm, Stations <br />1+00 through 5+00. <br />i <br />i <br />REMARKS: <br />A second vibratory compactor was brought onto the site last evening. Repairs were <br />made to the other compactor, which had a flat tire yesterday fternoon. Both <br />compactors were working today by approximately 11:30 a.m. <br />Isolated unstable areas were observed on the outside of the berm ~t Stations 2+50 <br />through 3+50. A layer of rock was rolled into the unstable ar~as. Deflection <br />under front end loader travel was not observed on subsequent lifts of material <br />placed in the area. i <br />Seven nuclear density tests were performed at the given locations and elevations. <br />The test results indicated that the minimum compaction requirements were met at the <br />test locations. <br />Employees with Reclamation Resources Inc., were informed on the test results. <br />DAILY DIARY <br />111I GEOTECHNICAL, MATERIALS ~ <br />JI.~ ENVIRONMENTAL CONSULTANTS <br />
The URL can be used to link to this page
Your browser does not support the video tag.