Laserfiche WebLink
DAILV DIARY <br />PROJECT: ALMA PLACER MINE <br />LOCATION: PARK COUNTY, COLORADO <br />SOURCE: BERM CONSTRUCTION <br />PROJECT N0: 4-4561-11191-10 REPORT N0: 1 DATE: 5/3 /90 <br />PROCTOR N0: 1,2 TIME: 6.0 HOURS <br />SAMPLE N0: N/A ENGINEERING TECHNICIAN: AGU~ <br />NORK PERFORMED: <br />The contractor was in the process of removing overburden soil fror ~ the top of the <br />old berm. No compaction had been done in the areas tested. <br /> <br /> <br /> <br /> <br />EMARKS: I <br />I <br />I <br />I <br />~ <br />Seven nuclear-density tests were taken. Three of the tests were in the old berm <br />and the remaining four were probably still in the overburden. Results of Test <br />Numbers 1, 4, 5, and 6 are not conclusive because of the 3 inch an 6 inch cobbles <br />encountered in the test area. j <br />I <br />I <br />I <br />I <br />DAILY DIARY <br />1 ~',I <br />6EOTECNNIGLL. WTERIALS i <br />I~, <br />~ <br />1 <br />ENVIRONMENTAL CONSULTMITS <br />J <br />' <br /> <br /> <br /> <br />