Laserfiche WebLink
DAILY DIARY <br />PROJECT: ALMA PLACER MINE <br />1 <br />LOCATION: PARK COUNTY, COLORADO <br />SOURCE: BERM CONSTRUCTION <br />I <br />PROJECT N0: 1-4561-11191-10 REPORT N0: 6 DATE: 6/1 <br />/90 <br />PROCTOR N0: N/A TIME: 9.5 HOURS <br />SAMPLE N0: 1 ENGINEERING TECHNICIAN: DEA GELIS <br />YORK PERFORMED: <br />Fill placement continued today on both sides of the berm exclud ng the southern <br />~ <br />portion of the berm areas near the south pond where moist clay exis s on both sides <br />of the berm. <br />i <br />i <br />i <br />I <br />i <br />I <br />i <br />REMARKS: <br />I contacted Fred Ladd by telephone regarding the unstable area near the south pond. <br />Mr. Ladd stated he wanted to observe the area tomorrow. <br />Ten nuclear-density tests were performed at the given locations and elevations. <br />The test results indicated that the minimum compaction requirements were not met at <br />the test locations. <br />Employees with Reclamation Resources, Inc., were informed of the te~t results. <br />DAILY DIARV <br />ll~. . ~ 6EQfECHNICAL, MATERIALS i <br />J ` v~ ENVIRONMENTAL CONSULTANTS <br />1 <br /> <br />