Laserfiche WebLink
WESTERN <br />COLORADO REVIEW OF CONSTRUCTION <br />TESTING, <br />INC. Job No,: 800198 <br />Client: Powderhom Coal Company Report No.: 3 Date: 9-10-98 <br />Project: Waste Coal Piles GR9 h - 2 Report ey: W. Hafev Date: 9-10-98 <br />Prime Contractor. Powderhom Coal Company Superintendent: John Irvin <br />Subcontractor: Superintendent: <br />Work in progress and/or completed since last report: The client is comaacting waste coal material at a +2,0' lift on the <br />north waste coal stockpile. The entire top surtace area of the said stockpile has been watered and compacted with a CAT <br />C54336 steel wheel vibratory compactor. <br />Unexpected site conditions: NIA <br />Sampling and/or testing peAormed: Waste coal at north stockpile was tested for moisture and comaaction values. <br />Moisture results were <br />Conformance of materials, operations and/or test results to project requirements: Density and moisture results met <br />oroiect requirements. <br />PersoNpersons notified of nonconformance to project requirements: N/A <br />Nonconformance corrected: NIA <br />Instructions or information received(from): John Irvin of Powderhom Coal Comaanv informed this WCT. Inc. technician <br />that the location from Test #2. Report #2, needed to be retested. <br />Weather: Cloudy and warts. wRh slight precipitation at times <br />Technicians time on project today: 2.5 hours No. of visits today: 1 <br />Time and date of next visit: Will call Reviewed by: S~ <br />Msb:jobs~9001 X0910 <br />