My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP46748
DRMS
>
Back File Migration
>
Report
>
REP46748
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:50:04 AM
Creation date
11/27/2007 11:17:19 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981028
IBM Index Class Name
Report
Doc Date
12/11/2001
Doc Name
1995 AHR & ARR RECLAMATION REPORT
Annual Report Year
1995
Permit Index Doc Type
HYDROLOGY REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />EXPLOSIVES USAGE <br />Discussion <br />The conclusion of 1995 brought with it the decision by Coors Energy <br />Company (CEC) to not renew its Explosives Use Permit. This action was the <br />result of (1) having concluded demolition of the Tipple Complex and its <br />concrete structure and supports, (2) finding itself with a meager inventory of <br />explosive items, too small to be effectively used for any purpose but enough <br />to be a nuisance if kept around, and (3) having no plans for activity in the <br />near future which would require the use of such materials. Future <br />requirements for explosives use will likely be of such a nature that they can <br />be contracted, rather than being done "in-house". <br />L~ response to the receipt of Division forms for the 1996 Explosives Permit <br />renewal, Coors Energy Company submitted a letter stating its intent to <br />discontinue the use of explosives, indicating that all remaining inventories had <br />either been consumed or destroyed (the small amounts and types of materials <br />were such that the explosives suppliers would not accept them for <br />restocking), and requesting a "close-out inspection" of the storage facilities <br />and records (copy of letter attached, for reference). When the inspection has <br />been completed, and the Division's requirements satisfied, the equipment and <br />structures associated with this activity will be scheduled for removal as part <br />of the reclamation process. <br /> <br />AHR-1995 -119- <br />
The URL can be used to link to this page
Your browser does not support the video tag.