Laserfiche WebLink
For J. A. Kiger April 12, 1996 <br />WES'T' PTT EXCESS SPOIL FILL CONSTRUCTION UPDATE AND CERTIFICATION <br />During the quarter beginning January 1, 1996 and ending March <br />31, 1996, I inspected the area in which the West Pit Excess Spoil <br />Fill is being constructed. The purpose of these inspections was to <br />inspect the areas currently being dumped complete by the <br />truck/shovel fleet; inspect the fill for areas of water seepage or <br />surface drainage and to satisfy the requirements of CDMG Rule <br />4.09.1(lla). <br />During the inspections it was observed that the truck dump had <br />advanced to the point that the 7250 contour was nearly dumped in. <br />Most of the dumping during the quarter had occurred well within the <br />limits of the fill and had no impact on any of the fill slope. No <br />photographs were taken as no significant work was performed during <br />the quarter. <br />Attached to this report are my certification that all <br />construction requirements have been met thus far in constructing <br />the West Pit Excess Fill. <br />r <br />Stephen R. Hinkemey <br />~~ ~ ,~~/~ <br />Sr. Mining Engineer <br />c.c. central files <br />'~~ <br />