My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP46690
DRMS
>
Back File Migration
>
Report
>
REP46690
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:49:59 AM
Creation date
11/27/2007 11:15:42 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1974086
IBM Index Class Name
Report
Doc Date
7/22/1994
Doc Name
NOTICE OF INTENT TO CONTINUE MINING OPERATIONS 112 ANNUAL REPORT
Permit Index Doc Type
ANNUAL FEE / REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
iii iiiiiiiiiiiii iii • <br />Permittee Name: <br />Permit No: <br />Operation Name: <br />Anniversary Date <br />Total: <br />Notice of Intent to Continue Mining Operations <br />112 Annual Report <br />Asphalt Paving Company <br />M-74-086 <br />Ralston Quarry <br />07/24/94 <br />,~E- _ ~,. <br />~:. <br />RUC 22 1994 <br />`~ ~ ., <br />/ ~~ <br />~I <br />YES NO <br />MORE LESS <br />$550.00 (Due on your Anniversary Date) <br />1. Has this mine been granted TEMPORARY CESSATION STATUS? <br />Does this mine operate MORE or LESS than 180 days per year? <br />2a. Financial Warranty: $46,650.00 2b. Permitted acreage <br />3. Does this mine have a phased reclamation plan? <br />4. Total acres affected during the report year:* <br />5. Total acres reclaimed for the report year:" <br />207 <br />YES NO <br />2 <br />6. Total acres in various stages of reclamation:' <br />a. Backfilled: 1 This period d. Topsoil replaced: 0 thi~neriod <br />b. Graded: 1 This period Average topsoil thickness <br />replaced: N/A <br />c. Seeded: 0 This period <br />List species seeded & seeding <br />rate for report year on back <br />7. The type and approximate quantity of fertilizers, organic material or soil <br />conditioners used for the report year:' N/A <br />8. Estimated total acres to be affected in the next report year:" 2 <br />9. COMMENTS: Quarry conditions cause a delay between disturbance and re-seeding <br />' Please show the location of the acreage for items 4 - 6 on your map" . <br />Indicate the phases of the reclamation which have been completed, correlated with <br />your timetable. <br />•' ~NOIE: If there have not been any changes since the last annual report and you <br />previously submitted a map which correctly depicts the current acreage in items 2 <br />through 6, then a new map is unnecessary. However, you must state this fact above. <br />Signature: - --~.,,,,~ F/~„yyr,_ Date: ~~~~~ <br />Please type or ~nt current contact name, mailing address, and phone number below <br />Contact Name: <br />Company: <br />Address: <br />Tamar M c~ ~,,,, ~ Phone: (303 ) 279-6611 <br />Asphalt Paving Co. <br />14802 W. 44th Ave. <br />Golden, Co 80403 <br />Federal Tax ID No. or Social Security Nc. <br />~4 <br />~~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.