Laserfiche WebLink
Dan Mathews - 8 - February 10 2004 <br />24. 2 West Portals -Substation of portal areas. Reference Exhibit 58. <br />Located in the NEY<, Section 11, Township 11 South, Range 98 West, 6'h <br />P.M. <br />Area - 0.7 acres <br />Date -December 2001 <br />Seed Mix -See attached "Seed Mix, Exhibit G" <br />25. Cameo Refuse Disposal Area Topsoil Piles -These piles were used for <br />top soiling the CRDA2 during final reclamation activities. Located in the <br />SE'/, Section 28, Township 10 South, Range 98 West, 6"' P.M. <br />Area - 2.9 acres <br />Date -April 2002 <br />Seed Mix -See attached "Seed Mix, Exhibit E", Lowland Components <br />26. Conveyor Corridor -The conveyor corridor, from the Icel. culvert north to <br />Haul Road #3 was graded to approximate original contours and reseed. <br />Located in SE'/4, Section 27 and NWY<, Section 34, Township 10 South, <br />Range 98 West, 6`" P.M. <br />Area - 2.7 acres <br />Date -July 2003 <br />Seed Mix -See attached "Seed Mix, Exhibit E", Upland Components <br />(g) Vegetation Studies -None during 2003. <br />(h) Other -None. <br />Sincerely, <br />~ `,~, <br />J. E. Stover, P. E.. <br />Consulting Engineer <br />Enclosures <br />cc: DMG -Grand Junction Office w/o enclosures <br />