Laserfiche WebLink
Colorado Division of Minerals and Geology <br />Annual Reclamation Report for the Year 2006 <br />MARR MINE G80-006 KERR COAL COMPANY <br />mine name pertntt# Permittee <br />Address: 10390 BRADFORD ROAD STE 205 LITTLETON. CO 80127-6416 <br />This report, required by Rule 2.04.13, is due by February 15 of each year, or other date, as agreed upon <br />by the Division. h should indude text, discussion, and maps, at a minimum, in addition to any other <br />reclamafion monitoring data as required by the approved permit. The location of the acreage reported <br />under each land status category and year of seeding (rf applicable) should be Beady and accttratety <br />iderrtfied on a map included with the report. <br /> <br />Land Status Category Last Years <br />Cumulative Total This Calendar <br />Year <br />Cumulative Total' <br />Acres disturbed 401.4 + 0.0 = 401.4 <br />Acres backfilled and raded 0.0 + 7.9 = 7.9 <br />Acres to oiled Ind reseeded) 357.1 + 7.9 = 365.0 <br />Seeding typically begins the minimum 10-year reclamation liability period. Please report the acres for <br />each category below. Do not indude acres that have achieved final, Phase III release. <br /> Last Years This Greater <br /> Cumulative Calendar Cumulative 10 years or than 10 <br /> Total year Total' less years' <br />Acres seeded' 348.6 + 7.9 = 355.5 = 247.3 + 108.2 <br />*indude, if necessary, a description of any augmented seeding or cutturat practices <br />For the Entire Life of Mine. the total number of acres disturbed 401.4 and the total number of acres: <br />Phase 1 released 324.0 Phase II released 169.0 Phase III released 0.0 <br />For Mines in Pennanerrt Cessation: <br />Total acreage in fadlities subject to reclamation but yet to be completed 0.2 (plus 4.0 ac cendina) <br />For Government Performance and Results Act <br />Acreage in long-term mining or reclamation fadlities z 75.2 <br />Acreage in active mining areas' 326.2 <br />'(exclude acres where Phase III release has been achieved) <br />~ Includes haul and access roads; temporary dams and impoundments; permanent dams and impoundmeMS; diversion and <br />collector dktches, water and air monHoring sites; topsoil stock~kles; overburden stockpiles; repair, storage and construction areas; <br />offxn? area, repair shops, and parking; coal stoci~lles, loading, and processing areas; rahoads; coal conveyors; non~ackfilled and <br />graded areas of refirse piles, kxral mine waste impoundments, headof~w0ow fills, and valley figs; ventilation shans and entryways; <br />and non-coat waste disposal area (garbage dumps and coal combustion by-products disposal areas)- <br />' IIx:IUdes pits, topsoB stripped areas in advance of pits, and spoil krot backfilled and graded <br />