Laserfiche WebLink
<br />CANONSDOLOMITEPQUARRYN RECE~'~' }-~ ~ <br />ANNUAL REPORT - MLR SEP 1~ i~--~ <br />September 1983 - September 1984 <br />MINED LAND R~CLRMAT' "' '~'~''t <br />Colo. Dep. ,,, ti~.u„ ,._~~..,~s <br />(1) CFI did not operate the Caflon Dolomite Quarry during <br />the report period and no acres (new or disturbed) were <br />affected. <br />(2)-(6) No reclamation was performed during the mining year. <br />The approved quarry permit defers all reclamation until <br />completion of mining at the Quarry. <br />(7) CFI does not anticipate operating the Quarry for its <br />own use during the period from September 1983 through <br />September 1984. Other alternatives are presently being <br />investigated. <br />Since there are no affected or reclaimed acreages for the <br />reporting period, a map is not being submitted with this report. <br />Please refer to that which was submitted in 1982. <br />The Division will be advised as to any change in status of <br />the Quarry. <br />9/14/84 <br />2 <br />