Laserfiche WebLink
iiiiuiiiiiiiiuiii <br />RAG EMPIRE CORPORATION WASTE PILE INSPECTION FORM <br />PILE I.D. NO. 121 ]-CO-09-0]370-O1 (SURFACE WASTE PILE) <br />PILE I.D. NO. 1211-CO-09-01370-02 (OLD NO.9 EXCAVATION) <br />DATE/TIME: !~-; ~ ~<` ~ <br />~, - <br />INSPECTOR SIGNATU//RE: ~.~ / ;fir f Cl <br />INSPECTOR TITLE: L~Yly ~~N. <br />Under the supervision of Gary Buchan, Colorado P.E. <br />This inspection was conducted to comply with DMG Rule 4.09.1(11). <br />This inspection was conducted [o evaluate: <br />A. Stability of fill (quarterly inspection) <br />%i% B. Critical construction periods: <br />I. Removal of all organic material/topsoil <br />2. Placement of underdrainage system <br />3. Installation of surface drainage system <br />4. Placement and compaction of fill materials <br />NOTES: <br />RE <br />AL ~-~ <br />tle:l:\EMEN V IRONMENTAL\EMPIREUNSPREP\W ASTEPILEFORM.DOC <br />5. Revegetation <br />