My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP46428
DRMS
>
Back File Migration
>
Report
>
REP46428
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:49:36 AM
Creation date
11/27/2007 11:07:38 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1984063
IBM Index Class Name
Report
Doc Date
3/7/2005
Doc Name
2004 Annual Hydrology Report /2003 Mistakenly Sent
From
American Canopy & Equipment Inc
To
DMG
Annual Report Year
2004
Permit Index Doc Type
Hydrology Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EASTSIDE MINE <br />Water Monitoring Program <br />Introduction <br />Baseline surface water quality was obtained in September 1983 with a full suite of chemical parameters <br />analyzed. Additional surface and underground hydrologic sampling was analyzed for a full suite of <br />chemical pazameters in Apri11984. Eastside's hydrologic monitoring program was initiated in July 1984. <br />Surface and underground field parameters were measured, and samples for chemical parameters were <br />collected as defined by Stipulation 1 ofthe Mining and Reclamation Permit, C-84-063, approved January <br />14, 1985. Due to a large reduction in flow, monitoring of the two underground wells and seep was <br />eliminated. After three years of quarterly sampling with no significant deviations or variations of the <br />chemical parameter, sampling of the surface water was reduced from quarterly to semi-annual basis. <br />The present surface sampling pointsare: 1-Harvey Gap Outlet-Above Mine; 2-Harvey Gap Outlet-Below <br />Mine; 3-Seep below Harvey Gap Reservoir. The ground water sampling point is the four inch pipe <br />installed through the mine portal seal to dischazge water from the mine if the water level should rise <br />sufficiently in the underground workings of the mine. To date no dischazges have occurred from the <br />mine. <br />The Geotech Well, the sampling point for the proposed location for the waste disposal, was reclaimed <br />in June of 1995. <br />The water monitoring program was initiated by Stephen Self, General Manager. Current monitoring is <br />performed by Stephen Self. Samples for the full suite of chemical parameters are shipped to ENVIRO- <br />CHEM Laboratory in Grand Junction, Colorado for analysis. <br />Page 1 of 22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.