My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP46413
DRMS
>
Back File Migration
>
Report
>
REP46413
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:49:35 AM
Creation date
11/27/2007 11:06:27 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981033
IBM Index Class Name
Report
Doc Date
3/4/1994
Doc Name
MONITORING REQUIREMENTS FOR 1994 AHR
Permit Index Doc Type
HYDROLOGY REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ouality Control On Well Sampling And AnalVSis <br />All water samples are taken by employees or agents of the Operator <br />using proper sampling procedures. Before obtaining a sample from <br />the alluvial wells, three well volummes will be removed or the well <br />will be completely evacuated and the recharge will be sampled. No <br />filtering system is available on site, therefore, the samples are <br />filtered at the testing laboratory. Samples will be packed in ice <br />and sent to the laboratory within one day of sampling. <br />Equipment utilized to take field measurements are calibrated on the <br />day of sampling prior to each sampling event. <br />Figure 2H, Laboratory Quality Assurance Program, gives a brief <br />summary of ACZ INC's Quality Control Program utilized for analysis <br />of the samples. <br />2.04-30v Rev. 03-04-94 <br />
The URL can be used to link to this page
Your browser does not support the video tag.