My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP46259
DRMS
>
Back File Migration
>
Report
>
REP46259
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:49:21 AM
Creation date
11/27/2007 10:51:25 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982055
IBM Index Class Name
Report
Doc Date
6/6/2001
Doc Name
QUARTERLY COAL WASTE BANK INSPECTION REPORT
Permit Index Doc Type
Waste Pile/Fill Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
III IIIIIIIIIIIII III DEG ~ <br />999 <br />QUARTERLY COAL WASTE BANK INSPECTION REPORT <br />COMR Rules 4.09.1(11) and 4.10.2(2) <br />Mine: Raton Creek <br />Waste Bank MSHA ID. No.: Primary Refuse Disposal Area <br />lnspection Period: Second Quarter 2001 <br />Inspection Date: 6-Jun-01 <br />General Description or Reference to Site Ptan: <br />Raton Creek Mine is in final reclamation. All required strictures have been removed, <br />the area brought to final grade, mulched and seeded. Areas of lesser vegetation <br />density were inter-seeded in 2000. <br />Activity During Inspection: <br />Area was inactive thoughout the quarter. Additional sized rock has been placed <br />on the west facing armoured drainage ditch. <br />Ground cover was dry. Good growth of vetch and earlier season grasses interspersed <br />with annual weeds was noted. <br />copy <br />Drainage: (Discussion of springs. seeps, overland and channel flow, underdrain construction and/ <br />or discharge, integrity of 100-year 24-hour drainage structures, and evidence of positive drainage). <br />No springs or seeps were observed on the refuse side slopes. Positive drainage is established on <br />all areas. Vegetation has been established on reclaimed areas with some minor Tilling on more <br />sparsely vegetated areas. Drainage and diversion structures were intact with some minor sediment <br />accumulation noted on the west facing diversion ditch above and to the south of the water tank. <br />Underdrain Construction has been completed. <br />Observation of Fill Construction: (Description of material, compaction, lift thicknesses, slopes, <br />and construction methods). <br />Structure has been completed to final grade. No additional material placement is anticipated. <br />Page 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.