Laserfiche WebLink
iii iiiiiiiiniii iii <br />999 <br />_~~" <br />srtreoFCO~oaAOO =~_ .,ooo ~~+,~.~ w.~ <br />DEPARTMENT pF NATURAL RESOURCES <br />D. Monte Pascoe. Executive Director <br />• <br />C <br />l~'IIi~iED LAND RECLAMATION <br />a23 Centennial Building. t313 Sherman SGeet <br />Denver, Colorado 60203 Tel. (303) 666-3567 <br />Valco, Inc. <br />P.O. Box 550 <br />Rocky Ford, Colorado 81067 <br />January 3, 1983 <br />Re: File tJo. 77-222 <br />RECEIVED <br />JAN 2 61983 <br />MWEb ~nraD xECLAMATION <br />COLO DELI OV NATURAL 0.ESOU~ <br />CK 25zS~ <br /> Based upon our records, the anniversary date of your mining operation permit is <br /> January 25 and annual fees for the year(s) 1983 totalling <br /> $ are due on that date. Fees are based upon a schedule of <br /> 5350.00 if the operation is an open mining operation of IO acres or more and <br /> 5275.00 for any other operation 10 acres or more. <br />• also, to bring the Division up to date as to the mining and reclamation on the <br /> site, please submit a report and map (to a scale of not less than 100' to the <br /> inch and not more than 660' to the inch), indicating the phases of the reclama- <br /> tion plan which have been completed, correlated with the timetable. The report <br /> and map shall contain the following information: <br /> 1) Location and number of acres affected during that year, <br /> 2) Locations and number of acres reclaimed for that year, <br /> 3) The location and number of acres in the various stages of reclamation <br /> (backfilled, graded, topsoil replaced, revegetatedJ, <br /> 9) The species of vegetation planted, the locations and approximate dates <br /> of planting, <br /> 5) The type and approximate quantity of fertilizers, organic material or <br /> soil rnnditioners used and location of use, <br /> 6) An appraisal of the success of reclamation efforts, and in the event <br /> of failure of any efforts, a short narrative on the suspected or determined <br /> causes of such failure, <br /> 7) Estimates of the location and number of acres to be affected in the <br /> coming year, and <br /> 8) The effective date of the information provided above shall be no more <br /> than 45 days prior to the anniversary date. <br /> <br />David C. Shelton <br />Director <br />