Laserfiche WebLink
QUARTERLY COAL WASTE BANK INSPECTION REPORT <br />CDMR Rules 4.09.1(11) and 4.10.2(2) <br />Mine: <br />Waste Bank MSHA ID. No.: Primary Refuse <br />Inspection Period: Second Quarter 2005 _ <br />Inspection Date: 06/28/05 <br />General Description or Reference to Site Plan: <br />Raton Creek Mine is in final reclamation. All required structures have been rernoved, <br />the area brought to final grade, mulched and seeded. <br />Activity During Inspection <br />Drainage: (Discussion of springs. seeps, overland and channel flow, underdrain construction <br />and/or discharge, integrity of 100-yr 24-hr drainage structures, and evidence of positive drainag?). <br />All required underdrain construction has been completed. <br />S~CUa~S ~~' v s~ pS~r S' S ~,/t! Q d e/'U P - <br />Observation of FIII Construction: (Description of material, compaction, lift thicknesses, <br />slopes, and construction methods). <br />Structure has been completed to final grade. No additional material placement has occurred <br />this quarter nor is anticipated. <br />