Laserfiche WebLink
I ~ <br />quarterly basis to the Division. <br />c. NPDES Reports- Rule 4.05.13(2)(iii) states that the NPDES reports shall be <br />submitted to the Division on the same time schedule as required by the <br />NPDES permit, or within 90 days following sample collection, whichever is <br />earlier. Please submit the NPDES report on a quarterly basis to the Division. <br />d. Groundwater and Surface Water Monitoring is currently submitted in the <br />AHR report. This submittal is in compliance. <br />e. Vegetation and overburden sampling is currently submitted in the ARR <br />report. This submittal is in compliance. <br />4. The Division reviewed the AHR. The data provided by Colowyo indicate normal <br />seasonal fluctuations in surface and groundwater quantity and quality that fall into <br />expected ranges. There do not appear to be any significant impacts to surface or <br />groundwater as a result of the mining operation. <br />If you have any questions or comments, please call. <br />Sincerely, <br />~:~ s. ~~~ <br />Erica S. Crosby <br />Environmental Protection Specialist <br />c:\colowyo\950501 <br />