Laserfiche WebLink
•,. <br />ANNUAL REPORT <br />INSTRUCTIONS <br />According to C.R.S. 34-32-I 16(3), and C.R.S. 34-32.5-I 16(3)(x), on the anniversary date of the permit each year, <br />the operator shall submit a re arp showing the extent of current disturbances to affected land, <br />reclamation ace fi1(Sli;h~d, o a d,dur~ng the preceding }'ear, new disturbances that are anticipated [o occur <br />during the upc tng.,year,. ny~,~~ ma~ that will be performed during the upcoming year. Please attach such <br />a report and magY~ld'Si'fiiua repott form. (An adequately labeled map that clearly delineates and includes <br />the above elements may suffice for a written report.) <br />If your operation is subject to the provisions of Temporary Cessation as defined in the Act and Rules, you must <br />provide with the Annual Report the following information as required by 2 CCR 407-1, 407-4, and Rules <br />1.13.7(1)(x): <br />(i) the conditioaof the operation at-the time of cessation; - - - <br />(ii) what specific measures have been and will be implemented to comply with reclamation, performance <br />standards and Environmental Protection Plan requirements, if they are pan of your approved application: and <br />(iii) plans for resumption of mining operations. <br />Please provide [he additional following information with your Annual Report, as' applicable: <br />(a) Per the requirements of 2 CCR 407-1, 407-4, and Rules 1.15(1), provide an updated statement <br />regarding the sufficiency of the value of the Financial Warranty, specifically: <br />(i) Per the requirements of 2 CCA 407-1, 407-4, and Rules LU(I)(a), provide an updated <br />statement regarding the sufficiency of [he value of the financial warranty. Specifically, <br />irrevocable letters of credit, Deeds of Trust, and security agreements, self-insurance, salvage <br />credit, and first priority liens on project related fixmres. <br />(ii) Per the requirements of 2 CCR 407-1, 407-4, and Rules I.IS(I)(b), permits secured with a <br />Deed of Trust or a Security Agreement, the operator shall submit an update, by a qualified <br />independent appraiser, indicating any changes in property value, and a statement summarizing <br />any circumstances which may affect the adequacy of the Deed of Trust, or Security agreement, <br />-" --- - and [he value of [he property subject to either of these instruments. The report shall also provide <br />proof that there are no past-due property taxes. <br />(i) Per the requirements of Z CCR 407-I, 407-4, and Rules 4.7(3), permits secured with an <br />Irrevocable Letter of Credit, the operator shall have the bank provide docuinenta[ion in [he form <br />of a balance sheet, certified by a Certified Public Accountant, demonstrating that the Letter of <br />Credit does no[ exceed ten percent (109c) of the bank's capital surplus accounts. <br />(ii) Per the requirements of 2 CCR 407-I, 407-4, and Rules 4.9.3(c), permits secured by a First <br />Priority Lien on any fixtures attd Equipment, the operator shall provide a report in sufficient <br />detail to fully describe [he condition, value, and location of all pledged fixtures and equipment. <br />(b) Per the requirements of 2 CCR 407-1, 407-4, and Rules 1.15(1)(c), all monitoring information <br />required as part of the approved permit application, to include the Environmental Protection Plan. (Please <br />note that if you are not a Designated Mining Operation, you will not have an Environmental Protection <br />Plan as part of your approved permit.) <br />