My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP45947
DRMS
>
Back File Migration
>
Report
>
REP45947
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:48:54 AM
Creation date
11/27/2007 10:46:00 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981038
IBM Index Class Name
Report
Doc Date
1/23/1989
Doc Name
DRAINAGE CONTROL AND DIVERSION STRUCTURES FOR COAL WASTE PILES
From
MLRD
To
COLORADO WESTMORELAND INC
Permit Index Doc Type
Waste Pile/Fill Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
M ~ III IIIIIIIIIIIIIIII <br />~~ °;,~ `Q STATE OF COLORADO <br />~• Roy Romer, Governor <br />t~.~/• ' <br />~ /B 76 •• _ <br />1 <br />DEPARTMENT OF NATURAL RESOURCES ~~~~ ~~~ <br />MINED LAND RECLAMATION DIVISION ~ ~~""~ ' ' <br />FRED R. BANTA, Director ~ l~'a ~~~ ~~\V <br />January 23, 1989 <br />htr. Link Derick <br />Colorado Westmoreland Inc. <br />P.O. Box ]299 <br />Paonia, Colorado 81428 <br />Re: Drainage Control and Diversion Structures for Coal Waste Piles <br />Dear hir. Derick: <br />During the 1988 oversight year, the Federal Office of Surface Mining initiated <br />a special study in reviewing Colorado's approved program. The subject of the <br />study was drainage and diversion ditch design for coal waste piles. During <br />this review it became apparent that drainage and diversion structures for some <br />waste piles were designed and constructed to control a 10 year-24 Hour storm <br />event. Colorado regulations require that these types of structures be <br />designed and constructed to safely pass a 100 year-24 hour storm event. <br />Specifically, see Colorado Rules 4.10.3(2) and 4.09.2(7). During our original <br />review, the Division interpreted the regulations such that these structures <br />were treated as temporary diversions only required to pass a 10 year event. <br />These structures were constructed in accordance with the approved plan, <br />however, the Division's interpretation was in error. <br />In order to resolve this problem without the use of enforcement actions, the <br />Division has entered into an agreement with OSM. To ensure that all coal <br />waste piles within the state meet the 100 year requirement, the Division has <br />reviewed the designs for all approved waste piles. All designs must be in <br />compliance by April 30, 1989 with actual on the ground modifications completed <br />by Play 30, 1989. Revision of designs by technical revision and on the ground <br />modifications by these dates will avoid the possibility of an enforcement <br />action being taken. <br />Enclosed is a memo which details the specific potential problems related to <br />your mines' refuse disposal area. <br />215 Centennial Building, 1313 Sherman Street Denver, Colorado 80203-2273 Tel. (303) 866-3567 <br />
The URL can be used to link to this page
Your browser does not support the video tag.