My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP45877
DRMS
>
Back File Migration
>
Report
>
REP45877
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:48:48 AM
Creation date
11/27/2007 10:44:37 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981047
IBM Index Class Name
Report
Doc Date
2/18/1992
Doc Name
MINREC INC BLUE RIBBON MINE VEGETATION MONITORING REPORT
Permit Index Doc Type
REVEG MONITORING REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br />1 <br />INTRODUCTION -------- <br />Between June 25 and June 28 of 1991, the Blue Ribbon Mine <br /> site (Permit Application C - 81 - 047) was visited and sampled <br /> in compliance with a committment on page 113 of the approved <br />t permit application ("The Operator shall determine the adequacy <br /> of revegetation during 1991, the midpoint of bond liability <br />' period"). The reclaimed mine surface is located within <br /> Section 2, T 13 S, R 91 W, 6th P.M. Sampling was carried out <br />' b <br />Matthew S <br />Ha <br />es <br /> y <br />y <br />. <br />. <br />1 <br /> As the enclosed map shows (adapted Exhibit Q), the <br /> reclaimed site consists of two reclaimed community types. The <br /> slope immediately below the former portal locations in the <br /> northeast portion of the permit area is delineated as <br /> grassland. A small section in the southwest portion of the <br />' permit area which was formerly a coal stockpile area also is <br /> designated as grassland. Areas of lowest elevation <br />' immediately east and west of Hubbard Creek have been <br /> delineated as a riparian reclaimed community. <br />1 <br /> Data was collected to determine if, at the midpoint of <br />' <br /> the ten year reclamation bond period, reclaimed communities <br />1 were progressing in directions that would satisfy reclamation <br /> success requirements. In the case of Blue Ribbon mine, <br />' reclamation standards have been established as the criteria <br /> that will be used to determine success. These are listed on <br />pages 113, 1131, and 113iii of the permit application. <br />' 1 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.