My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP45825
DRMS
>
Back File Migration
>
Report
>
REP45825
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:48:44 AM
Creation date
11/27/2007 10:43:54 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977321
IBM Index Class Name
Report
Doc Date
2/19/1993
Doc Name
NOTICE OF INTENT TO CONTINUE MINING OPERATIONS 110 2 ANNUAL REPORT
Permit Index Doc Type
ANNUAL FEE / REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• iiiiiiiiiiiiiiiiiii <br />~~e.,~ <br />,, <br />Notice of Intent to Continue Mining Operations <br />110(2) Annual Report FE~1 9 jgg~ <br />Permittee Name: Summit Brick & Tile ~INERgVI`~~`""'-~ <br />Permit No: M-77-321 is ~ vt~~ .~•. <br />Operation Name: Native/Pierre Mine* ~~ <br />Anniversary Date: 02/17/93 ~~ <br />Total: $175.00 (Due on your Anniversary Date) J~~l 3 y <br />1. Has this mine been granted TEMPORARY CESSATION STATUS? YES <br />Does this mine operate MORE or LESS than 180 days per year? ~MORgE LESS <br />2a. Financial Warranty: $ aSdO 2b. Permitted acreage: /, / fl <br />3. Does this mine have a phased reclamation plan? ~ NO <br />4. Total acres affected during the report year:* <br />5. Total acres reclaimed for the report year:* ~~/~7 <br />6. Total acres in various stages of reclamation:* <br />a. Backfilled: ~~ ~/~ d. Topsoil replaced: ~x c1 <br />b. Graded: /. o/ f} Average topsoil thickne s <br />c. Seeded: IQ SEE BA~k) replaced: <br />List species seeded & seeding <br />rate for report year on back <br />7. The type and approximate quantity of fertilizers, organic material or soil <br />conditioners used for the report year:* /Vo/tl/L <br />8. Estimated total acres to be affected in the next report year:* ~ <br />9. COMMENTS: OiPEI//OdS h1A0 /S ST/L c.- c~~PRECT, u~ ~/O <br />BAcKF~~~ >~ ~'RROE D, i A Acovy ~,9cE of BA~K~iccED A~PE9 <br />b E/~vvs HJ11~ 6d•T peEdio~s mflP is STic ~ ~~co~PA7Er <br />* Please show the location of the acreage for items 4 - 6 on your map**. <br />Indicate the phases of the reclamation which have been completed, correlated with <br />your timetable. <br />** NQIE: If there have not been any changes since the last annual report and you <br />previously submitted a map which correctly depicts the current acreage in items 2 <br />through 6, then a new map is unnecessary. However, this must be stated above. <br />Signature: l~ Date: ~ ~~ ~ 3 <br />Please type or int current contact name, mailj.ng address, and phone number below: /~ <br />Contact Name: ~oSFOi-f ~- WF~TF ~ Phone: (7~9 )SUo~ -~d~7S <br />Company: ,j'~//j1/N/T f~,Q~cK Q T/~~ ~o <br />Address: P D, ~OX 533 <br />/~ /~ G o f3/oo X533 <br />o33/~fao ~\~ <br />Federal Tax ID No. or Social Security Nc _8 ~ ~ __. !~\~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.