Laserfiche WebLink
' ,A <br />QUARTERLY INSPECTION REPORT <br />COAL WASTE BANKS <br /> <br />Rules 4.09(11) and 4.10(2)(2) <br />Ill <br />Date: s~~s /~ d-^~ QrmrJ~Gl f GfXJO <br />Waste Bank No: / "~iq t! L~G~yG ~o~Meit f 457'4° <br />General Description or Reference to Site Plan: <br />^ Golden Eagle -Exhibit 17, pages 2.05-19, 2.05-25 (a) through (c) <br />~ew Elk -Exhibit 30, pages 2.05-27 through 2.05-44 <br />Activity During Inspection: <br />^ Removal of Topsoil at Organic Matter <br />^ Installation of Surface Drainage System <br />^ Placement of Underdrain(s)' <br />^ Revegetation ^ Construction of Fill <br />Drainage: Include discussion of springs, overland and channel flow, underdrain construction <br />and/or discharge, integrity of 100-year 24-hour appurtenant drainage structures, evidence of positive <br />drainage. <br />The Gu(ve~~ i~l t~t+° no/7-~r~rst ~r~~q wos S:/>~~ <br />i~ 45 L°v1c~~°/IGP~ dY 57`4hc{in~ ~ yer- ups>S"e4~-, 0 7~ 7`~>° <br />Cu lver7`• <br />Observations of Fill Construction: Include description of material, compaction, lift thicknesses, <br />slopes of sides and faces, construction/ methodology. <br />Y D 4GC~i 7<70 vt ci•/ P ~l QP~' r5 ]'O `iG(.~C. 6z°L°n ~l4 C~°o~ <br />{~ ~oo~'o~l was ~~~~~ ~i~G, ~ lc>~~~~1 ~~Pe~ ~-/~ <br />oru~r~ ]`/'uG,~. s a_°ver4 / So~ 9 ~e4S ~e~~ od~~vP~ T! e <br />~uwf p fr'uc,~ ~°c~~e Sfrrclc i~ ogre o~~-dies/e 4~e~s <br />~I° So'~ 4~a5 5~-f!./ ~e I'rPPP~~ Qi~ olrl~ed eN~ Cohf~cyz°~- <br />Job No. 28,170 Page 1 of 2 <br />