My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP45746
DRMS
>
Back File Migration
>
Report
>
REP45746
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:48:37 AM
Creation date
11/27/2007 10:42:36 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981033
IBM Index Class Name
Report
Doc Date
3/30/1995
Doc Name
1992 1993 AND 1994 ANNUAL HYDROLOGY REPORT BEAR MINE PN C-81-033
From
DMG
To
TONY WALDRON
Annual Report Year
1992
Permit Index Doc Type
HYDROLOGY REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-. III IIIIIIIIIIIIIIII <br />999 <br /> STATE OF COLORADO <br />DIVISION OF MINERA LS AND GEOLOGY <br />Deparlmenl of Natural Resources <br /> <br />1313 Sherman St.. Room 2 <br />15 ~ <br />Denver, Colorado 80201 ~~~~ <br />Phone. (5031 866-3567 <br />FA%: (3031 832-8106 <br /> DEPARTMENT OF <br /> NATURAL <br />DATE: lSarch 30, 1995 RESOURCES <br /> <br />TO: <br />Tony Waldron Roy Romer <br />Governor <br /> lames 5. Lochhead <br />FROM: ChriBtine Johnatoa Etecutive Dire~mr <br /> Michael 8. Lang <br />RE: 1992, 1993, and 1994 al Hydrology Report; Bear IRY'>}19$Q1eCOf <br /> Permit No. C-81-033 <br />Pursuant to your request I have reviewed the 1993 and 1994 Annual <br />Hydrology Reports (AHR) for the Bear Mine. During the course of my <br />review, I discovered that the 1992 AHR had been reviewed but the <br />comments were not forwarded to the operator. So this memo also <br />addresses the 1992 AHR. <br />The alluvial well designations in the permit and the AHR are <br />reversed. On Map 10 in the permit, AA1 is shown as the well on the <br />west side of the facilities and AA3 is on the north side of the <br />facilities. On the map provided with the 1993 AHR, they have been <br />switched. In addition, the well data lists in the 1993 AHR that <br />correspond to the graphs have been reversed; the line for AA1 does <br />not match the data listed below the graph. Also, the lab reports <br />in the 1993 and 1994 have been changed to reflect different sample <br />IDs. Please ask the operator to clarify the well designation and <br />correct the AHRs or the permit. The well that shows the poorer <br />quality is on the west side of the facilities and will be referred <br />to in this memo as AA3, which corresponds to the AHRS. <br />Monitoring Requirements and Frequency <br />Bear Coal Company (BCC) has revised their monitoring plan twice. <br />The first revision occurred after the submittal of the 1992 AHR and <br />required monitoring the french drains for the 1993 AHR. The second <br />time followed the submittal of 1993 AHR. Monthly flow and field <br />parameters for springs G-26A, G-26B, and CR-12 are now required to <br />be collected between May and November. The results of this <br />monitoring appear in the 1994 AHR. <br />The monitoring plan for the 1993 AHR was on page 2.04-306, revised <br />March 4, 1994. The monitoring plan for the 1994 AHR is also on <br />page 2.04-306, revised March 4, 1994. Please see the enclosed <br />tables which contain the monitoring plan for each year and notes <br />made by me during the review. <br />
The URL can be used to link to this page
Your browser does not support the video tag.