Laserfiche WebLink
• Permittee Name: ~ewood Brick and Tile Co. ~ Page 2 <br />Permit No: M-79-045 <br />Operation Name: Church Pit <br />Anniversary Date: 02/28/99 <br />be used later to create the slopes into the bottom of the <br />mine (///). <br />Gravel - Albert Frei and Sons, Inc. mined the gravel under a <br />lease with the mineral right owners this year. A total of <br />11.94 acres has been stripped in Stage A to prepare it for <br />mining (brown). The material stripped was placed along the <br />perimeter of Stage A. Mining continued Stage A on the area <br />west of the road removing the south end of the pre-law <br />overburden storage area and the upper 4 feet of gravel from <br />the south side of Stage A (magenta). This material was <br />blended with material removed from the stripped area (tan) <br />to create the product Albert Frei and Sons, Inc. needed. <br />The current gravel operation has disturbed 21.80 acres ± in <br />the mine. <br />(2) No reclamation was required this year. The areas colored <br />green are being backfilled with waste materials. Filling <br />did continue on the old clay mining area in the (+++) <br />hatched areas. The backfilling on the south slope of the <br />old clay pit will establish the slope into the excavation <br />area and the bench along that part of the excavation was <br />expanded to cover 2.29 ac. ± (green). We continued to <br />install the sight berm along the west side of the facility <br />as required in the county plan this year (lite green). No <br />additional reclamation is required until mining for both <br />materials is completed in any given stage. <br />(3) Clay - Mining will continue in Stage I or Stage II, no new <br />area will be disturbed this year because we are mining in <br />the area stripped by the sand and gravel operator. We will <br />mine deeper into the clay veins exposed in the past and <br />advance the face to the north as approved in the reclamation <br />plan. Processing will continue in the Clay Plant Site Area <br />in Stage 0 (purple). We are using a small part of the east <br />side of Stage II to store clay produced at a mine near <br />Golden. It is used with the clay from this mine at our <br />brick plant in Lakewood. <br />Gravel - Albert Frei and Sons, Inc. will continue to remove <br />the pre-law overburden piles as needed and mine in the <br />stripped part of Stage A in the southeast part of the mine. <br />To date they have screened the material and hauled it to <br />another site for processing. This may change this year if a <br />crushing plan is installed on Stage A. <br />({) No reclamation is called for during the next year. However, <br />Albert Frei and Sons, Inc. will continue to backfill the <br />slope along the south side of the old clay pit. The waste <br />material from processing will be used to widen the flat area <br />