Laserfiche WebLink
HE LA ~ OOD BRICK AND TILE~OMPANIII'IIIIIIIII'll'll ) <br />Manutec[uroro Of • FACE 8 PAVING BRICK • SPECIAL SHAPES 6 THIN BRICK VENEER 1 ~~/ 1~ ~~ <br />OFFICE AND YARDS: 1325 JAY STREET ( ( F M O~ <br />tAKEWOOD. COLORAD0802142052 • TELEPHONE (303) 238-5313 \/" <br />FA% (303) 237-7737 <br />February 4, 1999 <br />Mr. Carl Mount <br />Division of Minerals <br />Minerals Section <br />1313 Sherman Street, <br />Denver, Colorado 802 <br />Dear Mr. Mount: <br />and Geology RECEIVED <br />Suite 215 !='-? Q Ly- ~~9~ <br />I_:1 <br />33-2273 <br />:°s:cn of ~dinerats & Geology <br />Re: Lakewood Brick and Tile Co. <br />Church Pit, Annual Report <br />MLRB Permit # M-79-045, <br />Anniversary Date 2/28/96 <br />FEDERAL TAS ID. # <br />This mine currently produces two materials, brick clay & <br />sand and gravel; that are being mined by different operators. <br />This pit HAS NOT been granted a Temporary Cessation and it HAS <br />operated more than 180 days this year. The approved bond amount <br />is $27,000 covering 75.74 acres ±, and the facility has seven <br />mining and reclamation phases. However, the current bond amount <br />in the Divisions possession is $40,000. Please refer to the <br />Annual Report Map attached for the areas discussed in this text. <br />We will deal specifically with the Annual Report require- <br />ments as outlined in Rule 1.15 of the Rules and Regulations and <br />those noted in the annual letter. <br />(1) Clay - No new area was disturbed by the clay mining opera- <br />tion this year. We continued to mine deeper on the land <br />previously disturbed (blue) north of the ditches. Approxi- <br />mately 21.37 acres is disturbed by the clay operation in <br />Stages O, I and II. This included the old clay mined area <br />(blue) south of the ditches and the Clay Plant site (pur- <br />ple). The clay face was advanced to the north into the area <br />mined by the gravel operation again this year. Waste mate- <br />rial created by the clay operation was stockpiled along the <br />west side in the overburden stockpiles. This material will <br />