Laserfiche WebLink
<br />Basin Resources, Inc. <br />Quarterly Inspection Report <br />. Coal Waste Banks <br />Rules 4.090 l) and 4.10 (2)(2) <br />Mine: IYEW ~l~ <br />Date: <br />Waste <br />General Description or Reference to Site Plan: <br />^ Golden Eagle -Exhibit I7, pages 2.05-19, 2.05-25(a) through (c) <br />New Elk -Exhibit 30, pages 2.05-27 through 2.05.44 <br />Activity During Inspection: /D~ ~ ~° ~C7-),v/~ --~~s r'1v~n['b <br />^ Removal of Topsoil or Organic Matter ^ Placement of Underdtain(s)• -( / '~/l <br />a <br />^ Installazion of Surface Drainage Systems ^ Revegetation ^ Construction of Fill <br />Drainage: Include discussion of springs, overland and channel flow, underdrain construction and/or discharge, <br />integrity of 10-0/T~yeaz 24-ho0ttr appurtetumt drainage structurers, evidence of positive drainage. <br />• /tee<~ m~ t~C/~ of Pad hG-~ h/~'s' Ia-.e~iGr ~/'/.cr.~ ~ ~N P~, <br />dS/ ( v~ Gf/'at/tu ~ /S PS <br />Su v ~GQ <br />/(/o .~r/i~ u- of 5f'////~S yew S~f-'1' G~ase d .~Sl~~'dP~ <br />Observations of F511 Constructiop: Include description of material, compaction, lift IhirJ<nesses, slopes of sides <br />and faces, construction methpdology._ . -.-;: , ~-'~-; <br />~° /9c~r/i lc~ Gktl -R_~~ <br />~- <br />Page l of 2 <br />