Laserfiche WebLink
i <br />ANNUAL REPORT <br />INSTRUCTIONS <br /> <br /> <br />According to C.R.S. 34-33-116(3), and C.R.S. 34-32.5-116(3)(a), on the anniversary date of the pl:rmit each year, <br />the operator shall submit a repott and a map showing the extent of current disturbances to affected land, <br />reclamation accomplished to date and during the preceding year, new disturbances th;tt are anticip~~ted [o occur <br />during the upcoming year, and reclamation that will be performed during the upcoming year. Plea>e attach such <br />a report and map to 1:nclosed annual report form. (An adequately labeled map that clearly delineates and includes <br />the above elements may suffice for a written report.) <br />If your operation is subject to the provisions of Temporary Cessation as defined in the Act and Rules, you must <br />provide with the Animal Report the following information as required by 2 CCR 407-1, 407-4, anti Rules <br />1.13.7(1)(a): <br />(I) the condition of the operation at the time of cessation; <br />(ii) what specific measures have been and will be implemented to comply with reclamaticn, <br />performance: standards and Environmental Protection Plan requirements, if they are pan o'' your <br />approved application; and <br />(iii) plans for resumption of mining operations. <br />Please provide the additional following information with your Annual Report, as applicable: <br />(a) Per the requirements of 2 CCR 407-1, 407-4, and Rules l.l~(1), provide: an updated ::tatement <br />regazding the sufficiency of the value of the Financial Warranty; specifically: <br />m Per the requirements of 2 CCR 407-1, 407-4, and Rules 1.15(1)(a.), provide an updated <br />statement regazding the sufficiency of the value of the financial warranty. Specifi:ally, <br />irevocable letters of credit, Deeds of Trust, and security agreements, self-insuran~;e, salvage <br />credit, and first priority liens on project related fixtures. <br />(u) Per the requirements of 2 CCR 407-1, 407-4, and Rules 1.15(1)0), permits secured with a <br />Deed of Trust or a Security Agreement, the operator shall submit an update, by a ~Iualified <br />independent appraiser, indicating any changes in property value, and a statement :summarizing <br />any circumstances which may affect the adequacy of the Deed of Tntst, or Security Agreement, <br />and the value of the property subject to either of these instruments. <br />- - - - The report shad also~rovide proof that there are no past-due propeorty taxes. - - -- - - <br />(iii) Per the requirements of 2 CCR 407-1, 407-4, and Rules 4.7(3), ~~ermits secured with an <br />Irrevocable Letter of Credit, the operator shall have the bank provide: documentation in the form <br />of a balance sheet, certified by a Certified Public Accountant, demoristratins that he <br />Lener of Credit does not exceed ten percent (10%) of the bank's capital surplus accounts. <br />(vi) Per the requirements of 2 CCR 407-1, 407-4, and Rules 4.9.3(1:), permits secured by a First <br />Priority Lien on any fixtures and Equipment, the operator shall provide a report in sufficient <br />dentil to fully describe the condition, value, and location of all pledged fixtures <br />and equipment. <br />(b) Per the requirements of 2 CCR 407-1, 407-4, and Rules 1.15(1)(c), all m~~nitoring information <br />required as part of the approved permit application, to include the Environmental Protecti~>n Plan. <br />(Please note, that if you aze not a Designated Minins Operation, you will not have an Envi ~onmental <br />Protection Plan as part of your approved permit.) <br />