i
<br />ANNUAL REPORT
<br />INSTRUCTIONS
<br />
<br />
<br />According to C.R.S. 34-33-116(3), and C.R.S. 34-32.5-116(3)(a), on the anniversary date of the pl:rmit each year,
<br />the operator shall submit a repott and a map showing the extent of current disturbances to affected land,
<br />reclamation accomplished to date and during the preceding year, new disturbances th;tt are anticip~~ted [o occur
<br />during the upcoming year, and reclamation that will be performed during the upcoming year. Plea>e attach such
<br />a report and map to 1:nclosed annual report form. (An adequately labeled map that clearly delineates and includes
<br />the above elements may suffice for a written report.)
<br />If your operation is subject to the provisions of Temporary Cessation as defined in the Act and Rules, you must
<br />provide with the Animal Report the following information as required by 2 CCR 407-1, 407-4, anti Rules
<br />1.13.7(1)(a):
<br />(I) the condition of the operation at the time of cessation;
<br />(ii) what specific measures have been and will be implemented to comply with reclamaticn,
<br />performance: standards and Environmental Protection Plan requirements, if they are pan o'' your
<br />approved application; and
<br />(iii) plans for resumption of mining operations.
<br />Please provide the additional following information with your Annual Report, as applicable:
<br />(a) Per the requirements of 2 CCR 407-1, 407-4, and Rules l.l~(1), provide: an updated ::tatement
<br />regazding the sufficiency of the value of the Financial Warranty; specifically:
<br />m Per the requirements of 2 CCR 407-1, 407-4, and Rules 1.15(1)(a.), provide an updated
<br />statement regazding the sufficiency of the value of the financial warranty. Specifi:ally,
<br />irevocable letters of credit, Deeds of Trust, and security agreements, self-insuran~;e, salvage
<br />credit, and first priority liens on project related fixtures.
<br />(u) Per the requirements of 2 CCR 407-1, 407-4, and Rules 1.15(1)0), permits secured with a
<br />Deed of Trust or a Security Agreement, the operator shall submit an update, by a ~Iualified
<br />independent appraiser, indicating any changes in property value, and a statement :summarizing
<br />any circumstances which may affect the adequacy of the Deed of Tntst, or Security Agreement,
<br />and the value of the property subject to either of these instruments.
<br />- - - - The report shad also~rovide proof that there are no past-due propeorty taxes. - - -- - -
<br />(iii) Per the requirements of 2 CCR 407-1, 407-4, and Rules 4.7(3), ~~ermits secured with an
<br />Irrevocable Letter of Credit, the operator shall have the bank provide: documentation in the form
<br />of a balance sheet, certified by a Certified Public Accountant, demoristratins that he
<br />Lener of Credit does not exceed ten percent (10%) of the bank's capital surplus accounts.
<br />(vi) Per the requirements of 2 CCR 407-1, 407-4, and Rules 4.9.3(1:), permits secured by a First
<br />Priority Lien on any fixtures and Equipment, the operator shall provide a report in sufficient
<br />dentil to fully describe the condition, value, and location of all pledged fixtures
<br />and equipment.
<br />(b) Per the requirements of 2 CCR 407-1, 407-4, and Rules 1.15(1)(c), all m~~nitoring information
<br />required as part of the approved permit application, to include the Environmental Protecti~>n Plan.
<br />(Please note, that if you aze not a Designated Minins Operation, you will not have an Envi ~onmental
<br />Protection Plan as part of your approved permit.)
<br />
|