My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-08-29_REPORT - M2002004
DRMS
>
Day Forward
>
Report
>
Minerals
>
M2002004
>
2006-08-29_REPORT - M2002004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/23/2019 8:40:49 AM
Creation date
11/27/2007 10:36:37 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2002004
IBM Index Class Name
Report
Doc Date
8/29/2006
Doc Name
Annual Fee/Report/Map
From
GCC Rio Grande
To
DRMS
Permit Index Doc Type
Annual Fee / Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
g. Water Quality. GCC has completed the water sampling program required <br />by the MLRB pursuant to Condition No. 1 of the Reclamation Permit. The data gathered <br />between April, 2003 and August, 2004 will be used to determine the extent and design of further <br />water quality monitoring efforts during operation of the mine. <br />GCC has obtained preliminary effluent limits from the Colorado Water Quality Control <br />Division. With this information, GCC can proceed to finalize its domestic wastewater treatment <br />system design and begin the local permit approval process. <br />h. GCC Rio Grande is actively pursuing engineering and construction related <br />to the development of a bridge crossing the St. Charles river. <br />i. GCC Rio Grande is actively pursuing engineering and construction related <br />to the development of the manufacturing facility and all internal roads on the plant property. <br />j. GCC Rio Grande has completed the development of studies and <br />assessments to support soon to be sought floodplain "water of the U.S." -related applications to <br />the Pueblo County and the U.S. Army Corps of Engineers. All approvals have now been issued. <br />2. Lime Road to 1-25 designated as the primary haul route. <br />a. On August 5, 2003, GCC Rio Grande and the Pueblo County Department <br />of Public Works entered into an agreement for the improvement of Lime Road. The Agreement <br />includes a commitment by GCC Rio Grande to provide the county with $200,000 to fund a study <br />of Lime Road and allow the County to select a proposal for improvement of Lime Road, GCC <br />Rio Grande has provided this amount to the county. The Agreement also commits $1.9 Million <br />of GCC Rio Grande funds to pay for the improvements to Lime Road selected by Pueblo <br />County. On July 27, 2004, the Board of County Commissioners approved a professional <br />services agreement for design engineering services between URS, Inc. and Pueblo County <br />related to the Lime Road reconstruction project. On August 2, 2004, the Public Works <br />Department issued URS a formal Notice to Proceed. <br />GCC Rio Grande Contact Information <br />Brian McGill <br />Environmental Manager <br />P.O. Box 3310 <br />Pueblo, CO 81005 <br />DN:321178862 <br />
The URL can be used to link to this page
Your browser does not support the video tag.