My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP45469
DRMS
>
Back File Migration
>
Report
>
REP45469
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:48:12 AM
Creation date
11/27/2007 10:36:34 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056
IBM Index Class Name
Report
Doc Date
2/7/2001
Doc Name
2000 AHR Review Letter
From
Kent Gorham
To
Janet Binns
Annual Report Year
2000
Permit Index Doc Type
Hydrology Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Department of Natural Resources <br />1313 Sherman St., Room 215 <br />Denver, Colorado 80203 <br />Phone: (303) 866-3567 <br />94~tL4~~~fi~~~6Memo <br />To: Janet Binns /!,~~~ <br />From: Kent Gorham l " <br />Date: 02/07/01 <br />Re: 2000 Annual Hydrology Report, Foidel Creek Mine, #C-82-056 <br />DIVISION OF <br />MINERALS <br />GEOLOGY <br />RECLAMATION <br />MINING•SAFETY <br />Bill Owens <br />Governor <br />Greg E. Walther <br />ExeNtive Director <br />Michael B. Long <br />Division Director <br />I have completed my cursory review of the 2000 Foidel Creek Annual Hydrology Report. <br />During the review, it became apparent that there may be a misunderstanding between TCC <br />and the Division concerning the surface water monitoring requirements. Before doing a <br />thorough review of the report, I wanted to make sure that the Division has all the available <br />data. <br />In the AHR text under the heading Surface Water Monitoring the operator states; <br />"Prior to the approval of TR-35 (May 2000), the permit required 12 flow and field parameter <br />monitoring instances to occur between March and September along with 4 water quality <br />sampling events. Prior to this approval, monitoring/samplinghegan in March with extra <br />monitoring and sampling planned to provide the required instances. TR-35 requires only <br />monthly flow and field parameter monitoring with only quarterly water quality sample <br />collection. After the approval of TR-35, the monitoring schedule was changed to comply, and <br />the extra monitoring/sampling was cancelled. As a result, the 2000 Water Year includes <br />fewer surface water monitoring/sampling instances than normal, however, all required <br />monitoring/sampling instances were completed during 2000." <br />According to our copies of the permit and the TR-35 file, the approved plan under TR-35 <br />continues to require 12 flow and field sample events and four full suite quality samples for 14 <br />surface water sites under a'Ylexible schedule throughout the normal flow period March to <br />September. Within this time frame, flow and field parameters will be measured 12 times and <br />four full suite analysis will be conducted:' (Reference Exhibit 14, page 148, TR-35 4/11/00 <br />footnote (1)). <br />The AHR includes 8 flow and field sampling events and 2 full suite samples for the majority of <br />the surface water sites. <br />Obviously, this misunderstanding should be resolved before undertaking any detailed review. <br />TCC should have the opportunity to provide any additional data before moving forward with <br />the review. <br />This concludes my initial review. If you have questions, please let me know. <br />CC: Dan Hernandez <br />• Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.