Laserfiche WebLink
.~ <br />Basin Resources, Inc. <br />Quarterly Inspection Report <br />Coal Waste Banks <br />Rules 4.09(11) and 4.10 (2)(2) <br />Mine: <br />V <br />Dace: ----\~~t/! ~ r~~ - l~~ <br />Wazte Bank No: t~irtP ~V~Xd l~I~C~VO (~lif,.lCs~ ~~02~~-~(, -C~4' -o~.~ ~~~ <br />General Description or Reference to Site Plan: <br />~ Golden Eagle -Exhibit 17, pages 2.05-I9, 2.05-25(a) through (c) <br />^ New Elk -Exhibit 30, pages 2.05-27 through 2.05-04 <br />Activity During Inspection: '~(~ <br />^ Removal of Topsoil or Organic Matter ^ Placement of Underdrain(s)• <br />^ Installation of Surface Drainage Systems ^ Revegetation ^ Cotuwction of Fill <br />Drainage: Include discussion of springs, overland and chatmel flow, undetdrain construction and/or discharge, <br />integrity of 100-year 24-hour appurtenant drainage structures, evidence of positive drainage. <br />/~e . ~ ,zt,e~ oPvo-t v~ ~. ~e rl~~ <br />/Uo S~/ I N S ~' S2-~ f Y~- <br />I ~ g~ <br />~-~r /'YIGI (K ~(N~~ <br />~BS (~ [fie- ~,~~/A c t^O-~ ~/~` S ~ {~/a f ~ (!.~-~r~ P~ %' oLv~ <br />l~ <br />Observatioru of Fill Consttvctiop: Include description of material, compaction, lift thiclmesses, slopes of sides <br />and faces, construction methpdology. <br />lVO ~t~lt5 1. 'lC:../-l.~ad(.P.{ <br />,,~ <br />-_ ~~~ <br />- J ~;` <br />.~-. V <br />••-- Page 1 of 2 <br />