My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP45242
DRMS
>
Back File Migration
>
Report
>
REP45242
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:47:54 AM
Creation date
11/27/2007 10:32:38 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056
IBM Index Class Name
Report
Doc Date
1/15/2002
Doc Name
1st half Review Checklist
From
Tom Kaldenbach
To
File
Permit Index Doc Type
Subsidence Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Review Checklist for Subsidence Monitoring Report <br />Mine: Foidel Creek Date this review was completed: 1/15/02 <br />Permit No.: C-82-056 CDMG reviewer: Tom Kaldenbach ~K <br />Report period: 1st half 2000 <br />Panel(s) mined during report period: 3 Right <br />Monitoring requirement Regulation citation In compliance: <br />Yes / no ? Comment <br /> <br />Installed and surveyed <br />monuments prior to 2.05.6(6)(c)(i)(A) Yes See comment on 2.05.6(6)(c)(i)(D), <br />underminin below. <br />Located monuments to Total surface strain is determined by <br />detect vertical locating monuments at expected <br />subsidence and 2.05.6(6)(c)(i)(B) Yes points of minimum strain (over <br /> <br />horizontal displacement. gateroads) and maximum strain <br /> (mid- anel). <br />Monitored each <br />structure's orientation, 2.05.6(6)(c)(i)(C) Yes <br />location, elevation <br />Monitored each <br />monument and structure 2.05.6(6)(c)(i)(D) Yes <br />at least uarterl <br /> Only the three powerlines (all in one <br /> corridor) and Middle Creek were <br />Commenced monitoring undermined during the reporting <br />of each monument and period. Monument H63 was first <br />structure at least one 2.05.6(6)(c)(i)(D) Yes surveyed 10/25/99, more than six <br />month prior to months before the powerlines were <br />undermining undermined in 6/00. Middle Creek <br /> was surveyed in 5/99, more than six <br /> months prior to undermining by <br /> anel 3R in 1/00. <br />Surveyed Hayden-Gore <br />Pass powerline on <br />schedule: daily when pp. 2.05-191.1 and yes <br />longwall face was 500 191.2 of permit <br />ft. before and 1500 ft. <br />after owerline. <br />Surveyed Wolcott Tap- <br />Wolcott (PSC) <br />powerline on schedule <br />depending on longwall <br />location: p. 2.05-191.2 of yes <br />a) advancing within permit <br />300 ft of line - <br />survey every two <br />days; <br />b) underneath line <br />
The URL can be used to link to this page
Your browser does not support the video tag.