Laserfiche WebLink
L J DEVELOPMENT, INC. <br />159 TIFFANY CT. PUEBLO, CO 81005 <br />JULY 19, 2002 <br />Tony Waldron RECEf;~/ED <br />Division of Minerals & Geology 2 2UDZ <br />MLRB 1UL 2 <br />Denverh CO 80203t. , RM 215 ~lvisl°° °t Mine~a~s a°d G°°~°9V <br />RE: BLASTING PLANS FOR THE FOLLOWING <br />SUMMIT BRICK & TILE CO. MINES: <br />MINE NAME PERMTT NUMBER <br />8-MII.,E CLAY MiE M-1977-320 <br />BEAVER CREEK CLAY MINE M-1977-322 <br />STOCKS CLAY MINE M-1977-324 <br />PATTON CLAY MINE M-1998-067 <br />EDMUNDSON CLAY MiINE M-1985-203 <br />CEDARWOOD CLAY MINE M-1977-317 <br />FOX No. l CLAY PTT M-1977-219 <br />Dear Mr. Waldron: <br />This is a follow-up letter which addresses the problems noted on your last inspection <br />of the first three (3) listed above mine sites S-Mine Clay Mine, Beaver Creek Clay <br />Mine, and the Stocks Clay Mine, (inspected 1/15102 ). We have also now addressed <br />the same potential problems on four additional mines which are listed above: the <br />Patton Clay Mine, Edmundson Clay Mine, Cedarwood Clay Mine and the Fox #1 Clay <br />Pit . The mines noted in this letter have all bean visited by Richard fd. Hipwell, <br />REG. PROFESSIONAL GEOLOGIST, and he has prepared Blasting Plans for the <br />mines listed above, which are being sent with this letter. <br />W e don't believe a Technical Revision is needed since we have been blasting as <br />part of the mining on all the the sites listed and have never had a complaint filed. <br />However with the Blasting Plans being submitted we have now up-dated our mining <br />plans to include Rule 6.5(4) which states; At sites where blasting is Hart of the <br />The reports furnished with this letter should fill the requirements of Rule 6.5(4), for all of <br />the listed seven (7) Clay Mines, operated by Summit Brick & Tile Co.. <br />PHONE (719) 240-9424 FAX (719) 564-3088 <br />