Laserfiche WebLink
r <br /> STERLING REDI-MV COMPANY <br /> P.O. Box 1908 <br /> STERLING, COLORADO 80751 <br /> December 8 , 2000 WECIWED <br /> DEC 1:12Z <br /> Mr. Carl Mount <br /> Division of Minerals and Geology nA)YisioBr�alAbra�r��Ge�asgy <br /> Minerals Section <br /> man Street Suite 215 <br /> Denver, Colorado 80203-2273 <br /> 1'-_ Mount: <br /> Re: Annual Report (112) <br /> MLR No. M-86-147, Harley Pit I <br /> Anniversary Date: 12/02/00 <br /> FEDERAL TAX ID# 84-387145 <br /> This pit HAS NOT been granted a Temporary Cessation, and it <br /> HAS operated more than 180 days this year. The Financial War- <br /> ranty for this operation is $20, 300. 00; the permitted area in <br /> Logan County; covers 38 . 00 ac. ± and the pit is not phased. As <br /> required in Rule 1. 6 the MINE PERMIT SIGN is at the entrance to the <br /> pit and the boundary has been outlined with posts to delineate <br /> the Permit Boundary. <br /> The annual report requirements in the MLRB Rules and Regula- <br /> tions, and the annual review letter are addressed in the follow- <br /> ing report. Please refer to the enclosed ANNUALREPORT MAP for <br /> areas discussed in this report. <br /> (1) We continued to mine on the northeastern part of the permit- <br /> ted area mining an the 2 . 53 acres ± partially mined last <br /> year. We reached the mining limits on a 2 . 09 ac. ± section <br /> of the west slope. Most of this is slope area so the floor <br /> now covers approximately 20. 24 acres (green) . <br /> (2) No reclamation was required this year. Existing slopes are <br /> rough graded and we have approximately 685 feet temporary <br /> bank sloping complete on the south (orange) . The slopes in <br /> the active mining area are unchanged from last year. Some <br /> final grading may take place on the west area this winter <br /> during cold weather. <br /> (3) We will continue to mine in the area colored brown until the <br /> mining limits are reached. Stripping will continue on area <br /> above the face of the mine and the soil will be used for <br /> reclamation. We expect to mine approximately 3 . 00 acres <br /> next year. <br />