Laserfiche WebLink
• TABLE 1 WATER INFLOW /OUTFLOW RECORD <br />L J <br />MONTH <br />2003 <br />OCTOBER <br />NOVEMBER <br />DECEMBER <br />2004 <br />JANUARY <br />FEBRUARY <br />MARCH <br />APRIL <br />MAY <br />JUNE <br />JULY <br />AUGUST <br />SEPTEMBER <br />TOTAL <br />McCLANE CANYON <br />MINE PUMP TO WATER PUMP TO MONTHLY <br />IMPORT INFLOW OUTFACE ROADS SED POND MINE <br />f:r1NSl IMFII OIITSIDF 11SF INFLOW <br />0 373,000 173,120 83,600 0 629,720 <br />0 373,000 540,000 20,900 0 933,900 <br />0 373,000 490700 17540 0 881,240 <br />0 373,000 375100 39200 0 787,300 <br />0 373,000 272900 62100 0 708,000 <br />0 373,000 426100 61000 0 860,100 <br />196,000 177,000 - 0 177,000 <br />378,000 - 0 0 <br />423,000 0 0 <br />333,000 40,000 0 40,000 <br />0 373,000 0 373,000 <br />0 373,000 2,950,900 34,000 0 3,357,900 <br />1,330,000 3,201,000 5,228,820 318,340 <br />MUNGER CANYON <br />USED AT <br />MUNGER EXPORT <br />U tf,748,11iU <br />GPM 16.9 <br />PUMP TO MONTHLY <br />SED POND TOTAL <br />MONTH IMPORT <br />2003 <br />0 0 0 0 0 <br />0 0 0 0 0 <br />0 0 0 0 0 <br />2004 <br />OCTOBER <br />NOVEMBER <br />DECEMBER <br />0 0 0 0 0 <br />0 0 0 0 0 <br />0 0 0 0 0 <br />0 0 0 0 0 <br />0 0 0 0 0 <br />0 0 0 0 0 <br />0 0 0 0 0 <br />0 0 0 0 0 <br />0 0 0 0 0 <br />TOTAL 0 0 0 0 0 <br />Notes The office bathhouse consumes approximately 12,000 gallons per month which is not <br />accounted for in the above tables since the water is imported. <br />JANUARY <br />FEBRUARY <br />MARCH <br />APRIL <br />MAY <br />JUNE <br />JULY <br />AUGUST <br />SEPTEMBER <br />Consumptive use in the mine assumed to be 373,000 gallons per month based on 2000 AHR. <br />Mine inflow estimate is based on assumed consumptive use plus discharge and <br />water used for dust suppression. <br />I • <br />