Laserfiche WebLink
'~ III IIIIIIIII IIII III <br />~" sss r_nC(~F1Vt=D <br />BATTLE MOUNTAIN GOLD COMPANY ~P ~ B ~~~` <br />o1v1s1bn d(M~nerais ~ r~selegy <br />September 4, 1996 <br />Mr. Jim Dillie c~orio COMPANY <br />Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver, Colorado 80203 <br />Subject: Battle Mountain Resources, Inc. -San Luis Project <br />DMG Permit No. M-88-1 12 <br />Mo I and Compliance Report -August 1996 <br />Dear Mr. Dillie: <br />Attached is the August 1996 monthly summary of cyanide analysis performed on samples <br />from the tailings pond, the post detox, and the collection pond as required. Daily samples <br />of the tailings pond and the collection pond and weekly samples of the post detox are <br />analyzed on-site. TR-O10 specifies a simply monthly average for regulating pond <br />compliance. The August averages are as follows: <br />Tailings Pond 2.46 ppm CN-wad, 2.85 ppm CN-total <br />Collection Pond 0.20.pprn C-N-wad;-0:30-ppm-CN_fota <br />Post Detox ~ 5 ppm CN-wad, 3.81 ppm CN_t~ <br />The August simple averages show compliance with our permit standards of 3.8 ppm CN- <br />wad and 4.4 ppm CN-total. Samples collected on August 14 and 28 were sent to Core <br />Laboratories for outside lab verification. <br />Sincerely, <br />Sally H. Kaiser <br />Environmental Engineer <br />Enclosures <br />cc: Anne Baldrige <br />Dan Robertson <br />P.O. BOX 310 SAN LUIS, CO 81152-0310 (719) 672-3362 EXT. 39 FAX (719) 672-3363 <br />