Laserfiche WebLink
<br /> <br />Pitch Reclamation Project April 29, 2004 <br />2003 Annual Reclamation Report Page 1 <br />7.0 INTRODUCTION <br />1.1 Terms and Conditions <br />Lynx Enterprises, Inc. was retained by Homestake to collect the data from contractors engaged <br />at the Pitch Reclamation Project and assemble this report of the 2003 monitoring and <br />reclamation activities. Data for this report was provided by: Lynx Enterprises, Inc., SRK, Inc., <br />Energy Laboratories, Inc., and the Homestake-Pitch Project field office in Sargents, Colorado. <br />1.2 Purpose and Scope of Work <br />This report was prepared to fulfill the annual reclamation reporting requirements of Homestake <br />to the Colorado Division of Minerals and Geology for Reclamation Permit #M-77-004. This <br />report primarily presents reclamation and monitoring conducted during the 2003 calendar year. <br />Documentation of reclamation conducted in previous years was presented in prior annual <br />reports. <br />1.3 Project Description <br />The Pitch Reclamation Project is located in Township 48 North, Range 6 East, Saguache <br />County, Colorado. The project area is located in the Gunnison National Forest. The primary <br />drainage from the property is Indian Creek. Drainage from Tie Camp Creek joins Indian Creek <br />upstream of the CDPHE discharge monitoring point at the project site. Indian Creek joins <br />Marshall Creek approximately four miles southwest of the Pitch property. A site location map is <br />provided as Figure 1. <br />2.0 LAND DISTURBED IN 2003 <br />Surface disturbance in 2003 was limited to work associated with the final site improvements in <br />the area of the Radium Treatment Plant (RTP), and the continued preparation of demolition <br />material for burial in the disposal cell located at the toe of the Tie Camp Creek Low-Grade Ore <br />Stockpile. These activities occurred on land already disturbed by project related facilities. No <br />new land disturbance occurred at the Pitch Reclamation Project during 2003. <br />3.0 RECLAMATION ACTIVITIES IN 2003 <br />During 2003, reclamation activities at the Pitch site focused on two primary areas: 1) the area <br />adjacent to the dismantled RTP (including the stream channel) and, 2) the Tie Camp Creek <br />Disposal Cell. Reclamation in the area of the RTP included planting of trees on the slope of the <br />drainage opposite the RTP site. All work was conducted in accordance with applicable <br />conditions in the Radioactive Materials License and the Pitch Reclamation Project Procedures <br />Manual. <br />3.1 Reclamation <br />Reclamation activities in 2003 consisted of the reclamation and drainage Improvements in the <br />area of the old RTP building and the adjacent drainage. The site of the RTP was backfilled and <br />recontoured in 2001, with final grading and initial revegetation in 2002. These activities included <br />grading and shaping of the steep embankment behind the RTP site to reduce the slope and <br />prevent sloughing. <br />