Laserfiche WebLink
iii ~~~ili~i~~~~~~ll <br />999 <br /> <br />QUARTERLY INSPECTION REPORT <br />COAL WASTE BANKS <br />Rules 4.09(11) and 4.10(2)(2) <br />M <br />Waste Bank <br /> <br />General Description or Reference to Site Plan: <br />^~ ~Golden Eagle -Exhibit 17, pages 2.05-19, 2.05-25 (a) through (c) <br />IYIVew Elk -Exhibit 30, pages 2.05-27 through 2.05-44 <br />Activity During Inspection: <br />^ Removal of Topsoil at Organic Matter <br />^ Installation of Surface Drainage System <br />^ Placement of Underdrain(s)` <br />^ Revegetation construction of Fill <br />Drainage: Include discussion of springs, overland and channel flow, underdrain construction <br />and/or discharge, integrity of 100-year24-hourappurtenant drainage structures, evidence of positive <br />drainage. <br />- ~I/o SPr': ~ s a r- q~s o~ 4cX•'v~ SeeP~~~ ~~ <br />o~rf,~ <br />Ttie Cu~f~rt oPl 7~iG Aor'~`~ GG.S7r ~no~ off' wt?Sxc ~ti~ <br />%S wgSbe~ in, <br />Observations of Fill Construction: Include description of material, compaction, lift thicknesses, <br />slopes of sides and faces, construction methodology. <br />- MQ~`:4/ ~~oM y'~~ S~ol.',~,e~y- ~p~toP t/os ~e;~J p~QC~-d <br />4S ,-Il Qt- ~i;s yy~. T1te ~'h ~,ar~er;Q~ wv/s~ f~e~r ~~`- 0[~>r~ <br />~~a~ ~ P~4~ Qrddho~ •~~e ~te.S tJt' ~i e ~r4S~ D4nr <br />yp CO.n~gin '~ fil/l~7~ hb'jnP/'iv~ / ,jG f~Jt_M4Yer~4~ ivi l~ /~~1~/l <br />11G M~.t-rJ Wi ~~ Tfie ~rr~r r`'Ki ~'~°~/ Q~ CO~y~pC'fe~ t ~/" <br />~'%~~ • ~fl~ S~ior<l~l be co~y~vc~ ~ ~ro~~ t- ~ec;~c~y~o., <br />Job No. 28,170 Page 1 of 2 <br />