Laserfiche WebLink
.. <br />ANNUAL REPORT ~~ ' <br />INSTRUCTIONS <br />According to C.R.S. 3#-32-1 16(3), and C.R.S. 34-32.5-116(3)(a), on the anniversary date of the permit each year, <br />the operator shall submit a report and a map showing the extent of current disturbances to affected land. <br />reclamation accomplished to dale and during the preceding year. new disturbances that are anticipated to occur <br />during the upcoming year, and reclamation that will be performed during the upcoming year. Please attach such <br />a report and map to enclosed annual report form. (An adequately labeled map that clearly delineates and includes <br />the above elements may suffice for a written report.} <br />If your operation is subject to the provisions of Temporary Cessation as defined in the Act and Rules, you must <br />provide with the Annual Report the following information as required by 2 CCR 407-1, 407-4, and Rules <br />1.13.7(1)(aj: <br />(i) the condition of the operation at the time of. cessation; <br />(ii) what specific measures have been and will be implemented to comply with reclamation, performance <br />standazds and Environnten[al Protection Plan requirements, if they are part of your approved application; and <br />(iii) plans for resumption of mining operations. <br />Please provide the additional following information with your .Annual Report, as applicable: <br />(a) Per [he requirements of 2 CCR 407-1, 407-4, and Rules 1.15(1), provide an updated statement <br />regarding the sufficiency of the value of the Financial Warranty, specifically: <br />(i) Per the requirements of 2 CCR 407-1.407-4, and Rules I.15(I)(a), provide an updated <br />statement regarding the sufficiency of the value of the financial waranty. Specifically. <br />irevocable letters of credit, Deeds of Trust, and security agreements, self-insurance, salvage <br />credit, and first priority liens on project related fixtures. <br />(ii) Per [he requirements of 2 CCR 407-1, 407-4, and Rules 1.15(1)(b}, permits secured with a <br />Deed of Trust or a Security Agreement, the operator shall submit an update, by a qualified <br />independent appraiser, indicating any changes in property value, and a statement summarizing <br />any circumstances which may affect the adequacy of the Deed of Trust, or Security agreement, <br />- -- - - and-the-value of the property subject-to either-of these instruments. _The report shall.also.provide <br />proof that there aze no past-due property taxes. <br />(i) Per the requirements of 2 CCR 407-1, 407-4, and Rules 4.7(3), permits secured with an <br />hrevocable Letter of Credit, the operator shall have the bank provide documentation in the form <br />of a balance sheet, certified by a Certified Public Accountant, demonstrating that the Letter of <br />Credit does no[ exceed ten percent (] 090) of the bank's capital surplus accounts. <br />(ii) Per the requirements of 2 CCR 407-1, 407-4, and Rules 4.93(c), permits secured by a Firs[ <br />Priority Lien on any fixtures and Equipment, the operator shall provide a report in sufficient <br />detail to fully describe the condition, value, and location of all pledged fixtures and equipment. <br />(b) Per the requirements of 2 CCR 407-1, 407-4, and Rules 1.15(1)(c), all monitoring information <br />required as part of the approved permit application, to include the Environmental Protection Plan. (Please <br />note [ha[ if you are not a Designated Mining Operation, you will not have an Environmental Protection <br />Plan as part of your approved permit.) <br />