Laserfiche WebLink
• have flow. Monitoring results collected during 1992 and 1993 will be the baseline information <br />with which future monitoring results will be compazed. <br />These stations were monitored monthly. No flow was recorded for the stations except for HN-1 <br />Hawksnest Creek, which had flow in Mazch, April, and May. The monthly field parameters <br />were measured each month there was flow in Hawksnest Creek, and the quarterly full suite of <br />surface water pazameters was analyzed in March. <br />The northern corner of the Sanborn East tract is projected to undermine the upper reaches <br />of a tributary of Thompson Creek. T-1 (Thompson Creek will be monitored to establish its flow <br />characteristics. This surface water monitoring point is designed to verify the underground mine <br />does not have any adverse effect on the quality or quantity of run-off from the creek. Monitoring <br />results collected in during 1996 will be the baseline information with which future monitoring <br />results will be compared. <br /> <br />• <br /> <br />