My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP44822
DRMS
>
Back File Migration
>
Report
>
REP44822
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:47:23 AM
Creation date
11/27/2007 10:24:29 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981022
IBM Index Class Name
Report
Doc Date
1/1/1998
Doc Name
1997 AHR
Annual Report Year
1997
Permit Index Doc Type
HYDROLOGY REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
173
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• have flow. Monitoring results collected during 1992 and 1993 will be the baseline information <br />with which future monitoring results will be compazed. <br />These stations were monitored monthly. No flow was recorded for the stations except for HN-1 <br />Hawksnest Creek, which had flow in Mazch, April, and May. The monthly field parameters <br />were measured each month there was flow in Hawksnest Creek, and the quarterly full suite of <br />surface water pazameters was analyzed in March. <br />The northern corner of the Sanborn East tract is projected to undermine the upper reaches <br />of a tributary of Thompson Creek. T-1 (Thompson Creek will be monitored to establish its flow <br />characteristics. This surface water monitoring point is designed to verify the underground mine <br />does not have any adverse effect on the quality or quantity of run-off from the creek. Monitoring <br />results collected in during 1996 will be the baseline information with which future monitoring <br />results will be compared. <br /> <br />• <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.