Laserfiche WebLink
III IIIIIIIIIIIIIIII <br /> STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Ucparlmenl of Nmural Resources <br />131 J Sherman Si.. Ronm 21 5 1 <br /> <br />Dcnvcr. Colorado 80203 ~I~ <br />~~ <br />I <br />r <br />Phnnc: 130}I 8hb-JSA7 l <br />FA%:1 1031 H32 8106 <br /> DEPARTMENT OF <br /> NATURAL <br />May 8, 1998 RESOURCES <br /> Roy Romer <br />Mr. Basil Bear governor <br /> laine+ 5. Lochhead <br />Bear Coal Company Etecwive Director <br />P.O. Box 1754 nachael B. Long <br /> Owision Director <br />Paonia, CO 81428-1754 <br />Re: 1996 Annual Hydrology Report; Bear Mine; Permit No. C-81-033 <br />Deaz Mr. Bear: <br />The Division has reviewed Beaz Coal Company's (Bear's) responses to our review of the 1996 <br />Annual Hydrology Report (AHR) for the Beaz Mine. The Division has the following remaining <br />comments concerning the 1996 AHR: <br />In the original text on page 3 of the AHR, Bear states that AA-3 saw a 203.6% rise in <br />conductivity and a 232.2% rise in total dissolved solids. In the revised text submitted with <br />Bear's responses, Bear states that the conductivity and total dissolved solids in well AA-3 <br />increased 104% and 145%, respectively. There is an appazent discrepancy between the <br />original text and the revised text. Please provide an explanation for this apparent <br />discrepancy and submit a revised report page, if appropriate. <br />2. Response accepted. <br />3. No further response is necessary. Be advised that monitoring stations and corresponding <br />measurements and parameters contained in the approved monitoring program (section <br />2.04.7 of the permit document) aze required to be collected, analyzed and reported. <br />4. Response accepted. <br />5. No further response is required at this time. <br />6. Response accepted. <br />