Laserfiche WebLink
Marr one and Loadout <br />2005 Reclamafio~ Report <br />12.0 REVEGETATION SUCCESS EVALUATION <br />April 11, 2006 <br />Revegetation success sampling was completed in 1999 on the pre-1986, 1995, and 1996 reseeded <br />areas. The results of this sampling are contained in a report prepared by ESCO Associates Inc. <br />dated February 2000. This evaluation included cover, annual production, shrub density and species <br />diversity/composition. Based on the sampling results, revegetation in these areas satisfies the <br />applicable revegetation success standards except for cover or shrub density in the pre-1986 <br />reclamation area. Kerr has continued managed grazing operations on reclaimed areas and <br />anticipates that the combination of grazing, progressive vegetative establishment from the initial <br />revegetated community, and natural re-invasion will enhance cover and shrub density. Kerr <br />completed year 9 revegetation success monitoring in 2005 and year 10 is scheduled to be <br />completed in 2006. <br />13.0 BOND RELEASE <br />Phase 1 bond release for the 720 Pit was approved in 1995 (173 acres) and for the Pit 1 in 1996 (48 <br />acres). These areas were initially submitted in the same bond release application but were <br />separated into different requests. An application for Phase I release for the Loadout Area and <br />Phase II release for the 720 Pit and Pit 1 Areas was filed with the DMG in SL-02. Following the <br />bond release inspection, DMG approved the application for partial bond release on June 26, 2001. <br />These areas included 6.9 acres for the Loadout (Phase I) and 169 acres for the 720 pit and Pit 1 <br />(Phase II). Apparently 3.6 acres within Pit 1 were excluded from the release due to poorer <br />vegetation status. An application for Phase 1 bond release was filed with the DMG in May 2001 for <br />the Marr Pit Area (pre-1986 reclamation). DMG approved the Phase I release in June 2002 for 96.5 <br />acres, although the Marr Pit is not included in the bond estimates so no funds were actually <br />released. According to the documents reviewed, 324 acres have been released from Phase I and <br />169 acres for Phase II. <br />14.0 TOTAL DISTURBANCE SUMMARY <br />The following table summarizes the total disturbance at the Marr Mine and Loadout inGuding the <br />reclaimed areas, areas to be reclaimed and the permanent facilities. <br />SUMMARY OF DISTURBANCE <br />Mine Area <br />Reclaimed 10 ears or less 233.5 ac <br />Reclaimed greater than 10 ears 108.2 ac <br />Areas to be Reclaimed 7.9 ac <br />Areas A roved as Permanent 36.1 ac <br />Areas Pending Permanent 4.0 ac <br />MINE TOTAL 389.7 acres <br />Loadout Area <br />Reclaimed 10 ears or less 6.9 ac <br />Areas to be Reclaimed ( and 0.2 ac <br />Areas Approved as Permanent 4.6 ac <br />LOADOUT TOTAL 11.7 acres <br />63712005!2005 annual recl rytfnl NWCC INC. Pages <br />