Laserfiche WebLink
~• ` Colorado Division of Minerals and Geo Logy 1, sheet 1 of 2 <br />ESi FM`AT ING FORK - EQUIPMENT MOBILIZATION / DEMOBILIZATION <br />Task #.,. 3 Prep- by RC Filename..M022-3 <br />Date...,. 01-May-95 Permit # N-95.02 Mine......Andrews #2 <br />Permit Action..,...,. Reclamation <br />Task Description..... Mob/demob Equipment om Limon <br />HOURLY EDUIPMENT COST <br />__________ __________ NOTE - This is list to select tram, not list of mandatory items to include. <br />Mob/Demob Eck. -Tractor 6x4, 75,000 lb G 375 HP, diesel power///~~~~~~...ddd <br />-Lt. frailer 25 ton folding g seneck, drop deck / <br />-Med. Trailer 50 tan folding goo eneck, drop deck / <br />-Xvy. Trailer 120 Ton folding 9oos neck, drop deck <br />-Pilot Car On-highway light dut truck, 4x2, 73 hp, 1/2 ton rating, gasoline powered <br />-Hyd. Crane Grove RTSBD rough tern in hydraulic crane, 20 ton rapacity, 125 hp, 60 ft. boom <br />-Fuel Truck :6x4, 3,600 gallon capac"ty, 210 RP diesel powered <br />-Cube truck :6x4, 2,500 gallon capaci y, 210 N diesel powered <br />-Flatbed Truck: 20,000 lb GVN, 175 HP, di sal po ered <br />Last Update: ----'---'---'------------- ---- ----._.._~.---`--`---`---`---"-_~,~__--_ <br />May, 1991 <br />--------------- Lt. Rig Med.Rig Hvy.R ig Pilo Hydreul is Fuel Labe Flatbed <br />Cost Breakdown: <=25 T. 26-50 T. > 50 T. Car Crane Truck Truck Truck <br />__________ .=v=e= .-___________________o=_ o===o===.==vo== -=====a=v=.v e===~=__`___`______=====zee==-=o===o===o <br />Ownership Cost/hr = f26.78 f29.16 537.74 S1. f19.89 t6.02 f10.66 16.70 <br />Operating Cost/hr = f23.23 524,76 529.92 f4.~ 5 f23.40 f16.79 520.77 f7.47 <br />Operator Cost/hr = 520.54 (20.54 520.54 519 81 f20.86 519.97 f19.97 579.97 <br />Helper Cost/hr = 519.87 519.81 519.81 f .00 f0.00 f0.00 f0.00 f0.00 <br />Total = 590.36 594.27 5108.01 5-25 .15 f42.18 f57,34 f34. 14 <br />NON-ROADABLE ECAII PMEMT: <br />Machine Description <br />Cet D6H <br />Fl t Size Neu( Trip Return Trip DOi Permit <br />(no_- aided) --Cost/hr cost/hr ----_ Cost/ea <br />_____ ____________________________________________ <br />f113.02 f90,36 <br />Yeight Ownership Haul Rig <br />(tons) Cost/hr Last/hr- <br />21.00 522. 590.36 <br />Subtotals 5113.0, f90.36 <br />f0.00 <br /> <br />