Laserfiche WebLink
<br />Basin Resources, Inc. <br />Quarterly Inspection Report <br />Coal Waste Banks <br />Rules 4.09(11) and 4.10 (2)(2) <br />Mine: <br />Date: <br />Waste <br />General Description or Reference to Site Plao: <br />^ Goldea Eagle -Exhibit 17, pages 2.05-19, 2.05-25(a) through (c) <br />New Elk -Exhibit 30, pages 2.05-27 through 2.05-44 <br />Activity During Inspection: <br />/ D~F /1/d /¢CT71/l~/ ~/S ~tl6~i~~ <br />^ Removal of Topsoil or Organic Maner / ^ Placement of Underdrain(s)• <br />a <br />^ Installation of Surface Drainage Systems ^ Revegetazion ^ Constntction of Fill <br />Drainage: Include discussion of springs, overland and channel flow, underdrain construction and/or discharge, <br />integrity of (00-year 24-hour appttnenant drainage structures, evidence of positive drainage. <br />/~~ C~~rn~ <br />~^ (fie,, m~( <br />~~ost~rv-~ <br />r~~ti ~- <br />S//1~-- / ~ C~u <br />~~0.INQ S~ ha f ,~-~, <br />-~datN~~ has ~ <br />~~ t C~ . <br />~Ip7. <br />~Q I N ~2. i n ft:% <br />es~" ~ ll f~~ o>-, L~- <br />/vd e rJt oCr//'~ ~ S~"~ f /Log s~'I GdaS• d ~~lJ-~ <br />Observations of flfl Constructiop: include description of material, compaction, lift thiclmesses, slopes of sides <br />and faces, construction methpdology. , <br />,[ _~ . <br />Page I of 2 <br />