My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP44670
DRMS
>
Back File Migration
>
Report
>
REP44670
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:47:10 AM
Creation date
11/27/2007 10:21:53 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981012
IBM Index Class Name
Report
Doc Date
5/13/1997
Doc Name
NEW MINE PN C-81-012 QUARTERLY REFUSE INSPECTION 1ST & 2ND QTRS 1997
From
BASIN RESOURCES INC
To
DMG
Permit Index Doc Type
Waste Pile/Fill Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Basin Resources, Inc. <br />Quarterly Inspection Report <br />. Coal Waste Banks <br />Rules 4.09(1 l) and 4.10 (2)(2) <br />Mine: <br />Date: <br />Waste Bank No: <br />General Description or Reference to Site Plan: <br />^ Golden Eagle -Exhibit 17, pages 2.05-19, 2.05-25(a) through (c) <br />New Elk -Exhibit 30, pages 2.05-27 through 2.05-44 <br />Activity Duting Inspection: ~~~_ U~~~ <br />/U~ ~yJflln/i`C,U~ <br />^ Removal of Topsoil or Organic Mazter ^ Placement of Underdrain(s)• <br />^ Installation of Surface Drainage Systems ^ Revegetation ^ Construction of Fill <br />Drainage: Include discussion of springs, overland and channel flow, underdrain construction and/or discharge, <br />integrity of 100-year 24-hour appurtenant drainage structures, evidence of posi[ive drainage. <br />~ ~° ~i/rn~~- S~~~ c~ / ~Q I ~ / `l ~7 <br />/vo 5~ l" l /I 5 N/o K S~~ pGrJP< 2 C/ ~r~,. ~j l Q <br />of ~ ~ R r"~N`^ `al~"'i <br />~~z : t tiYl ~2 Q~va r v~ ~~ c ~ S Z,/?/ <br />~~ S / ~r ~,.-~ GC /'cz r vt a ~ ~pr.-, S'GC v" ~ , <br /> <br /> <br />_ /~ir of f~pv~-~S /J~ti1~ /U.~'le <br />Gi;/J/~ ~'o ~-e~ riC ~5~•y/j . <br /> <br />~J <br />Observations of Fill Constructiop: Include description of material, compaction, lift thicfaesses, slopes of sides <br />and faces, construction methpdology. <br />18-~2~vr Cd~l S l v c.c ~9`~"t ~,~fa r rte/ lZz r dl <br />J~-2 r r r/1'! ~~ ////~i ~r~5 ~/1/1 ~-Z- <br />• ''~ 05 (~~'~ O("~a r it ~-~t_ . <br />ePiyj ~j /a r~~ ~ j2~ce_rv1~s~ <br />Page 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.