Laserfiche WebLink
~ III IIIIIIIIIIIII III <br />~. MINED LAND RECLABAA710N DIVISION <br />Department of Natural Resources <br />13t 3 Sherman S` .Room 215 <br />Uenver, CO 80203 <br />303 856 3567 <br />FA%: 303 632~Bt06 <br />February 28, 1990 <br />Elam Construction, Inc. <br />1225 S 7th St <br />Grand Junction, CO 81501 <br />112 Annual Fee Letter <br />• <br />STATE OF COLORADO <br />\~aD <br />~` <br />~~ ~~ <br />aF~.~-quo <br />ey'+'iai: ~. <br />v.i ~ '.C <br />`,~., - <br />r6]6" <br />Hay Home <br />Gc.crno~ <br />Fretl H Hama <br />Davison D~reao~ <br />In order to maintain your mining operation in compliance with the law, the annual <br />fees, report, and map required by C.R.S. 34-32-116(3) and (4) must be submitted <br />annually on or before your permit anniversary date. Fees are based upon a <br />schedule of 5350 if the operation is an open mining operation and 5275 for any <br />other operation. Division records indicate you owe 5350.00. <br />Permit No.: <br />Operation Name: <br />• Anniversary Date: <br />Annual Fees for the Year(s) <br />Total: <br />M-79-075HR <br />Chambers Pit <br />05/29/90 <br />1990 <br />5350.00 (Due on the Anniversary Date) <br />IF THE ANNUAL FEES AND ANNUAL REPORT ARE MOT RECEIVED ON OR BEFORE THE <br />ANNIVERSARY DATE, A CIVIL PENALTY IN THE AMOUNT EQUAL TD THE ANNUAL FEE AMOUNT <br />WILL 8E AUTOMATICALLY ASSESSED AND WILL BE DUE AND PAYABLE WITHIN THIRTY (30) <br />DAYS FROM THE ANNIVERSARY DATE, <br />If your records indicate different facts than those stated above, pi ease inform <br />this office as soon as possible, otherwise, we will expect to receive the annual <br />fees as required by the statute on or before your anniversary date. Also, <br />please include the required Notice o n en to Continue Mining Operations <br />(Annual Report to bring the Division up-to-date as to the progress of mining and <br />reclamation on the site) and the map. If you cannot include these materials with <br />the fees, please indicate on the enclosed sheet how soon we should expect to <br />receive the material. <br />Submittal of a report and map (to a scale of not less than 100' to the inch and <br />not more than 660' to the inch), indicating the phases of the reclamation plan <br />which have been completed and correlated with the timetable is required. The <br />report and map shall contain the following information: <br /> 1) Location and number of acres affected during that year; <br /> 2) locations and number of acres reclaimed for that year; <br />