My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP44353
DRMS
>
Back File Migration
>
Report
>
REP44353
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:46:44 AM
Creation date
11/27/2007 10:15:34 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Report
Doc Date
3/31/1993
Doc Name
MEMO SECTION 16 FILL QTRLY REPORTS
From
DMG
To
FILE
Permit Index Doc Type
Waste Pile/Fill Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• • iii iiiiiiiiniiiiii <br />999 <br />STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Department of Natural Resources <br />1313 Sherman Sl., Room 215 <br />Denver, CO 80203 <br />Phone: (303) 866-3567 <br />FA%:(303)832-8106 <br />OF'C°to <br />~~b <br />0 <br />F. <br />~ . <br />Roy Romer <br />Governor <br />MEMO TO FILE Mich. el B Lrnrp <br />Division Director <br />FILE #: C-S1-19 <br />OPERATOR: COLOWYO <br />MINE: COLOWYO <br />REC BPEC: Stephen F. Wathen <br />DATE: March 31, 1993 <br />SUBJECT Section 16 Fill: Quarterly Reports <br />PERSONS CONTACTED: Juan Garcia (in Jim Riger's absence) <br />HOW CONTACTED: Telephone <br />During my last inspection, Jim Kiger made the comment that he <br />didn't think that Colowyo needed to submit quarterly inspection <br />reports until the fill was finished [ie just for the "critical <br />construction periods" mentioned in the permit]. I mentioned that <br />I didn't think that was so. <br />I wanted to get back to Jim on this in order to caution him that <br />reports were to be submitted on z <br />the construction period and post <br />he would relay the message to Jim <br />quarterly basis throughout both <br />construction. Juan told me that <br />who was in Denver for a meeting. <br />According to Jim Pendleton (conversation 3-31-93), the clock starts <br />on the quarterly reports from the date the project is initiated on <br />the ground. Topsoil salvage began on the Section 16 Fill on 8-24- <br />92 according to Colowyo's 1-25-93 inspection report, this would <br />have made the due date for the quarterly report on 12-10-92 <br />according to Rule 4.09.1(11) (3 months plus 2 weeks for submittal). <br />The first quarterly report was received on 1-25-93, along with <br />three reports on critical construction periods. <br />I told Juan that although the first quarterly report was due on 12- <br />10-93 that we would use 1-15-93, based on two weeks past the end of <br />the calendar year, as the due date for the first quarterly report. <br />Based on this, that the due date for the next quarterly report <br />would be April 15. 1993 <br />Two reports on critical construction periods were late in being <br />submitted. Removal of topsoil and organic materials was completed <br />on 9-24-92 but the report was not received until 1-24-92. <br />Placement of the underdrain was complete by 12-9-92 but a report <br />was not received until 1-25-92. <br />I asked Juan to have Jim call me if there were any questions. <br />
The URL can be used to link to this page
Your browser does not support the video tag.