<br />MLRB Permit Tio. 77-222 - Rocky Ford South Pit <br />1982 Annual Report <br />1.) a) Stage 0 - no mining has been done since January 1, 1982. 12.23 acres <br />have heen affected. <br />b) Stage I - mining and backsloping were completed in this stage during <br />1982. 17.56 acres have been affected. <br />2.) Both stage 0 and stage I are backsloped and ready for seeding with top- <br />soil replaced, <br />3.) See map. <br />4,) No seeding was done in 1982. A seeding contractor was not able to sched- <br />ule during the months specified and mining was still proceeding in stage <br />I. Stage I still contains stock piles of finished material. It is an- <br />ticipated that these will be gone during 1983 and that seeding can be <br />done in the spring of 1984. <br />5.) See above. <br />6.) See above. <br />7.) Stage II - mining will be commenced in 1983. 7.22 acres will be affected. <br />8.) Effective date of this information is January 31, 1983. <br />Enclosed map is a copy of Exhibit D of the original application reduced to a <br />scale of 1" = 450'. <br />