My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP44311
DRMS
>
Back File Migration
>
Report
>
REP44311
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:46:41 AM
Creation date
11/27/2007 10:14:05 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1979010
IBM Index Class Name
Report
Doc Date
2/13/1997
Doc Name
NOTICE OF INTENT TO CONTINUE MINING OPERATIONS 112 C CONSTRUCTION MATERIALS ANNUAL REPORT
Permit Index Doc Type
ANNUAL FEE / REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
+ <br />~.. <br />Permittee Name: <br />Permit No. . <br />Operation Name: <br />Anniversary Date: <br />Total: <br />1 <br />2 <br />3 <br />4 <br />5 <br />• . III III III IIIIIII III <br />~~C;., . .: ~? <br />Notice of Intent to Continue Mining Operations <br />112c Construction Materials Annual Reoort <br />ff C; ~~ ~ ~~~~~~~ <br />Avery Structures Inc <br />M-79-010 <br />Avery Const Pit+ 7,y,~,~,, ,, <br />January 15, 1997 <br />$550.00 (Due on your Anniversary Date) <br />a. Permitted acreage: 40 b. County where mine is located <br />Has this mine been granted TEMPORARY CESSATION STATUS? <br />Does this mine operate MORE or LESS than 180 days per year? <br />Does this mine have a phased reclamation plan? <br />Total acres affected during the report year:+ _ <br />Total acres reclaimed for the report year:* <br />6. Total number of acres in topsoil replacement stage: None _ <br />a. Average thickness of topsoil replaced: N/A <br />~. Total number of acres seeded: None <br />a. List species seeded & seeding rate for report year on back <br />8. For non-phased operations provide dates extraction ceased: N/A <br />a. Date reclamation began: N/A <br />9. The type and approximate quantity of fertilizers, organic material or soil <br />conditioners used for the report year:* N/A <br />10. Estimated total acres to be affected in the next report year:* 1.0 <br />11. coHV~nerrrs: N/A <br />+ Please show the location of the acreage for items 4 - 6 on your map+*. <br />Indicate the phases of the reclamation which have been completed, correlated with <br />your timetable. For phased operations show dates extraction ceased and dates <br />reclamation began. <br />** NOTS: If there have not been any changes since the last annual report and you <br />previously submitted a map which correctly depicts the current acreage in items 2 <br />through 6, then a new map is unnecessary. However, this must be stated above. <br />Signature: ~~~~,~. Date: b~,6~vu.I~. 8, 199J <br />Please type or print current contact name, mailing address, and phone number below: <br />Contact Name: Charles A. Abel, II Phone: ( 719 ) 395-8625 <br />FAx No: (719 ) 395-8847 <br />Company: <br />Address: <br />ASI RCC, Inc. <br />P.0. Hox 3127 <br />Buena Vista, CO 81211 <br />Chaffee <br />YES PTO <br />MORE LESS <br />YES NO <br />1.0 <br />None <br /> <br /> <br />Federal Tax iD No. or Social Security No.: <br />
The URL can be used to link to this page
Your browser does not support the video tag.